The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400025
Survey no.
939 of TPS IV Mahim Division and Contiguous 12.20 mts. wide D. P. Road
North boundary
12 point 20 mts wide D P Road
East boundary
12 point 20 mts wide D P Road
South boundary
F P No 942 and 938
West boundary
F P No 934 and 935 and 937
What’s nearby
Schools1 school within 500m · 8 educational institutions within 1km · College or university 675m away
HealthcareHospital 27m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 1.4km away · Gym or sports centre 178m away · 11+ restaurants and cafes within 1km
Expressway 1.6 km · Dadasaheb Phalke MargPrimary road 171 m · Swatantrya Veer Savarkar MargRailway line 1.2 kmMetro station 359m away (Siddhivinayak Temple)7 bus stops within 500m
Water & environment
Water body 783 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. 939 of TPS IV Mahim Division and Contiguous 12.20 mts. wide D. P. Road
The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12601463
16 Mar 2026
Roznama Approvedopen
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,041 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,215 projects the radar draws within 6 km — every kind, every stage — 455 are residential projects still under way. This list keeps only those, and looks further out.