This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
Namdev Vihar
Units
32 units
Mix
21 × 2 BHK · 7 × 1 BHK · 4 × Shop
Carpet area
14–61 sq mper-unit range, as filed
Floors
11
Buildings
2
Parking
7 spaces
Land area
714 sq m
Sanctioned built-up
1,202 sq m
Recreational open space
483 sq m
Timeline
RERA registeredMar 2018
Proposed completionDec 2021
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
32 units across 8 batches
TypeArea sq mCount
2 BHK617
2 BHK537
1 BHK427
2 BHK617
Shop261
Shop251
Shop141
Shop291
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.7km away · College or university 1.1km away
HealthcareHospital 450m away · 4 clinics within 1km
LifestylePark 1.7km away
ShoppingSupermarket 1.5km away
Getting around
Expressway 378 m · Murbad RoadPrimary road 994 m · Kalyan-Murbad RoadRailway line 1.1 km · Mumbai–Nagpur RailwayRailway station 1.6km away (Kalyan Junction)Limited bus connectivity nearby
Water & environment
Water body 738 m · Kala TalaoRiver 1.6 km · Waldhuni River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹63,295per sq yd
₹75,700per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Chikanghar”.
In force
2026-2027 schedule
Spread
₹57,107 – ₹69,231 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Kalyan Dombivli Municipal Corporation
Municipal Corporation
Building Permit
Survey no. S.No. 121 H.No. 7A2 7A3
The promised possession date (30 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Kalyan Dombivli Municipal Corporation
Municipal corporation
Has approved 742 RERA projects — 3.7% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
585
On record
5,683 flats · 0 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,571 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,302 projects the radar draws within 6 km — every kind, every stage — 514 are residential projects still under way. This list keeps only those, and looks further out.
69 projects within 1 km — showing the nearest 6.
100 m awayResidential / Group Housing
Mangeshi Royale
Mangesh Dashrath Gaikar · Chikanghar · Kalyan
4 yr 1 mo
Apr 2022registered
May 2026target completion
Government Guidance Rate₹63,295/sq ydScale181 flatsAuthorityMahaRERA