SEN IMPERIAL

P51700078663 · MahaRERA · https://gethorizon.in/projects/sen-imperial-kalyan-i922stdh

01

Complete project overview

MahaRERA · Registration filing
Units
74 units
Floors
15
Buildings
2
Parking
141 spaces
Land area
1,920 sq m
Sanctioned built-up
3,866 sq m

Timeline

RERA registeredJan 2025
Proposed completionNov 2030
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Internal finishes9%
Stairs & lifts32%
Stilt floor50%
Superstructure64%
Excavation100%
Basement (if any)100%
Plinth100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

VASTURACHNA ASSOCIATES

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kalyan
Taluka
Kalyan
District
Thane
Pincode
421301
Survey no.
SURVEY NO 39/ HISSA NO 01
North boundary
SURVEY NO 40
East boundary
SURVEY NO 35
South boundary
CHIKANGHAR SURVEY NO 6
West boundary
15M WIDE PROPOSED DP ROAD
What’s nearby
SchoolsNearest school 1.8km away · College or university 1.0km away
HealthcareHospital 109m away · 2 clinics within 1km
LifestylePark 1.9km away
ShoppingSupermarket 1.2km away
Getting around
Expressway 17 m · Murbad RoadPrimary road 1.2 km · Kalyan-Murbad RoadRailway line 1.3 km · Mumbai–Nagpur RailwayRailway station 1.9km away (Kalyan Junction)Limited bus connectivity nearby
Water & environment
Water body 938 mRiver 1.5 km · Waldhuni River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹65,469per sq yd
₹78,300per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Kalyan”.
In force
2026-2027 schedule
Spread
₹36,037₹69,064 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Kalyan Dombivli Municipal Corporation

Municipal Corporation
Building Permit
Survey no. SURVEY NO 39/ HISSA NO 01
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Kalyan Dombivli Municipal Corporation

Municipal corporation

Has approved 742 RERA projects3.7% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
585
On record
5,683 flats · 0 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

2,532 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,241 projects the radar draws within 6 km — every kind, every stage — 486 are residential projects still under way. This list keeps only those, and looks further out.

59 projects within 1 km — showing the nearest 6.

ChikangharOthers

CHAVAN ADVAITAM

SAIDEEP CONSTRUCTIONS

Sep 2022registered
Dec 2026target completion
Government Guidance Rate₹63,295/sq ydScale266 flatsAuthorityMahaRERA
ChikangharResidential / Group Housing

SHIVNERI PARK CO OP HSG SOC LTD

SHREE SWASTIK CONSTRUCTIONS

Jul 2023registered
Mar 2027target completion
Government Guidance Rate₹63,295/sq ydScale84 flatsAuthorityMahaRERA
ChikangharResidential / Group Housing

Mangeshi Royale

Mangesh Dashrath Gaikar

Apr 2022registered
May 2026target completion
Government Guidance Rate₹63,295/sq ydScale181 flatsAuthorityMahaRERA
ChikangharResidential / Group Housing

Om Pushpanjali

R B CONSTRUCTION

Aug 2024registered
Dec 2026target completion
Government Guidance Rate₹63,295/sq ydAuthorityMahaRERA
GandhareOthers

9 SQUARE

SHIVSAI HOMES BUILDERS AND DEVELOPERS LLP

Jan 2023registered
Dec 2026target completion
Government Guidance Rate₹73,496/sq ydScale97 flatsAuthorityMahaRERA
Kalyan-DombivaliOthers

ROCK MOUNT RESIDENCY

BUILT CHARMS

Aug 2021registered
Jun 2026target completion
2 open complaintsGovernment Guidance Rate₹49,415/sq ydScale231 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.