Detailed Report
VEDANT LIVIANO
PR/GJ/SURAT/CHORYASI/Surat Municipal Corporation/RAA15871/200925/311230 · GujRERA · https://gethorizon.in/projects/vedant-liviano-choryasi-s4nsn7kd
01
Complete project overview
GujRERA · Registration filing
Project name
VEDANT LIVIANO
Units
208 units
Mix
208 × Flat
Carpet area
85–86 sq mper-unit range, as filed
Blocks
4
Parking
925 spaces
Timeline
Project startedJul 2025
RERA registeredSep 2025
Proposed completionDec 2030
TodaySep 2026
Construction progress
0% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
208 units across 1 batch
TypeArea sq mCount
Flat85208
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
208 homes · 74 plotson the public record across 2 projects
17,735 sq mbuilt-up filed
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 271m away · 5 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.6km away
ShoppingSupermarket 610m away
Getting around
Expressway 1.2 km · Flyover RampPrimary road 146 m · Amroli Utran BridgeRailway line 498 mRailway station 738m away (Utran)Bus stop within 500m
Water & environment
River 1.3 km · TapiWater body 2.2 km
distances only — not a flood assessment
Price analysisdeclared unit prices — not a live asking price
The unit prices the builder filed with the authority:
₹40.71 Lakh – ₹41.21 Lakhdeclared unit pricerange on the filing — not a live asking price
The unit prices as filed with the authority — not a live asking price. What a unit actually sells for, and any premium, sits above this and can move after the filing.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
The yearly satellite view ends in 2023 and this project started in 2025, so it does not cover this project's construction: the site was still open ground on the plot when the series ends. The 2026 image shows the site more recently.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is the plot the promoter drew.
Satellite photographs of the same ground
Mar 2017Mar 2023Jan 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
This series ends in 2023, before this project’s construction — so it shows what stood here before, and says nothing about whether building has since begun. The photograph does that.
Plot outline was drawn by the promoter on the RERA portal and can be misplaced - check it against the image.
The yearly site view ends in 2023, before this project started in 2025.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Gujarat registration department
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
GujRERA · Approved building plan
Surat Municipal Corporation
Municipal / Corporation
Building Permitapproved 20 Sep 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Surat Municipal Corporation
Municipal Corporation
Has approved 1,566 RERA projects — about 1 in 11 in Gujarat.
an apartments market — 85% apartments · 15% plotted layouts. Apartments like yours are this body's core business.
Builders
1,275
On record
2,64,009 flats · 16,727 plots
Reach
8 talukas
Since
2005
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
794 residential projects still under way within 25 km. Step out ring by ring:
Of the 928 projects the radar draws within 6 km — every kind, every stage — 308 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Gujarat's published schedules.
06Planning authority
GujRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
GujRERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/vedant-liviano-choryasi-s4nsn7kd.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.