HORIZON
Share

Velentine Apartment 1 Wing D

P51800002036 · MahaRERA · https://gethorizon.in/projects/velentine-apartment-1-wing-d-andheri-0v32q0m5

01

Complete project overview

MahaRERA · Registration filing
Units
182 units
Mix
151 × 1 BHK · 31 × 2 BHK
Carpet area
38–60 sq mper-unit range, as filed
Floors
37
Parking
134 spaces
Land area
1,452 sq m
Sanctioned built-up
2,488 sq m
Recreational open space
350 sq m

Timeline

RERA registeredJul 2017
Proposed completionJul 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

182 units across 6 batches
TypeArea sq mCount
1 BHK4031
2 BHK6031
1 BHK4027
1 BHK4231
1 BHK4131
1 BHK3831

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Velentine Properties Private Limited

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
2Projects
2Cities
2017–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
308 homeson the public record across 2 projects
4,975 sq mbuilt-up filed
2,904 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Velentine Properties Private Limited— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400097
Survey no.
CTS No 692/A/2/2/A/1
North boundary
13 Point 40 Meters D P Road
East boundary
36 Point 60 Meters D P Road
South boundary
CTS No 653 A-2 and 653-1A-1A
West boundary
CTS Nos 692-A-2-2A-2 and 678
What’s nearby
SchoolsNo schools within 2km · College or university 1.8km away
HealthcareHospital 1.9km away · 3 clinics within 1km
LifestylePark 580m away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.9 kmPrimary road 1.7 km · Jogeshwari Vikhroli Link RoadRailway line 2.5 kmMetro station 2.0km away (Goregaon (East))Limited bus connectivity nearby
Water & environment
Water body 927 m · Chota Kashmir Lake
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

4,175 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,996 projects the radar draws within 6 km — every kind, every stage — 665 are residential projects still under way. This list keeps only those, and looks further out.

25 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Transcon Triumph Tower 3

Transcon Triumph Phase 2 Private Limited · Andheri

Aug 2021registered
Sep 2026target completion
Scale316 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

CODENAME RARE BY RUNWAL

Runwal Developers Ltd · Andheri

Apr 2022registered
Jun 2026target completion
Scale68 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

SENROOFS PHASE - III

PIONEER HOUSING · Kurla

Dec 2021registered
Dec 2027target completion
Scale380 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

THE SANCTUARY - TOWER 2

Runwal Construction Private Limited · Kurla

Jan 2022registered
Mar 2027target completion
AuthorityMahaRERA
10 m awayResidential / Group Housing

INA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED

YASH REALTORS · Borivali

Feb 2022registered
Dec 2026target completion
Scale16 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Avyukta Neelkamal

Shivoham Associates · Borivali

May 2022registered
Sep 2026target completion
1 open complaintScale151 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.