21 × Support Services · 20 × It Ites · 17 × Itites · 2 × Incubation Centre
Carpet area
35–152 sq mper-unit range, as filed
Floors
21
Parking
90 spaces
Land area
1,474 sq m
Sanctioned built-up
7,714 sq m
Timeline
RERA registeredJun 2025
Proposed completionJan 2029
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Treatment And Disp…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
60 units across 13 batches
TypeArea sq mCount
Support Services505
Support Services355
It Ites357
It Ites8410
It Ites1462
It Ites1521
Incubation Centre851
Incubation Centre801
Support Services911
Support Services875
Itites507
Itites8710
Support Services845
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Thane (M Corp.)
Taluka
Thane
District
Thane
Pincode
400604
Survey no.
Plot No B59 (Part 1)
North boundary
Road No 29
East boundary
Plot No 58
South boundary
Plot No 48
West boundary
Road No 8
What’s nearby
Schools1 school within 500m · Library 2.0km away
HealthcareHospital 498m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 1.8km away · Gym or sports centre 808m away · 5 restaurants and cafes within 1km
Expressway 796 mPrimary road 1.6 km · Lal Bahadur Shastri MargRailway line 2.4 kmMetro station 1.7km away (Teen Hath Naka Station)19 bus stops within 500m
Water & environment
Water body 1.3 km · Rayladevi Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Thane (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923 – ₹1,55,185 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Maharashtra Industrial Development Corporation (MIDC)
Development Authority
Building Permit
Survey no. Plot No B59 (Part 1)
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Maharashtra Industrial Development Corporation (MIDC)
Metropolitan / development authority
Has approved 156 RERA projects — 0.8% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
118
On record
3,504 flats · 0 plots
Reach
9 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
277 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,539 projects the radar draws within 6 km — every kind, every stage — 59 are commercial projects still under way. This list keeps only those, and looks further out.
18 projects within 1 km — showing the nearest 6.
30 m awayCommercial
Orabel Business Park
Ekatva Buildpro · Thane
3 yr 1 mo
Aug 2026registered
Sep 2029target completion
Government Guidance Rate₹60,034/sq ydScale52 flatsAuthorityMahaRERA