The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Panchpakhadi
Taluka
Thane
District
Thane
Pincode
400602
Survey no.
plot_no 491 city_survey_gut_no FINAL PLOT NO. 491 final_plot_no FINAL PLOT NO. 491 sector_no 03 - T.P. SCHEME NO. 1 mauje PANCHPAKHADI road_street 12.19 MT TP ROAD society -
North boundary
By 40 ft. DP Road & beyond that Final Plots no.31
East boundary
Final plot no. 32
South boundary
On or towards East
West boundary
Proposed 40 ft. DP Road: Final Plot no. 33
What’s nearby
Schools1 school within 1km · Library 1.7km away
HealthcareHospital 130m away · 4 clinics within 1km · Pharmacy within 500m
LifestylePark 1.2km away · Playground within 500m · Gym or sports centre 447m away
Expressway 158 mPrimary road 857 m · Lal Bahadur Shastri MargRailway line 1.6 kmMetro station 1.6km away (Teen Hath Naka Station)12 bus stops within 500m
Water & environment
Water body 442 m · Siddheshwar Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹1,22,576per sq yd
₹1,46,600per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Panchpakhadi”.
In force
2026-2027 schedule
Spread
₹78,345 – ₹1,60,202 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
4,878 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,545 projects the radar draws within 6 km — every kind, every stage — 526 are residential projects still under way. This list keeps only those, and looks further out.
51 projects within 1 km — showing the nearest 6.
190 m awayOthers
HKs SILVER PALACE
HK Realtors · Thane
2 yr 11 mo
Jan 2025registered
Dec 2027target completion
Government Guidance Rate₹60,034/sq ydScale43 flatsAuthorityMahaRERA