HORIZON
Share

AMRUT MANTHAN APPARTMENT

P51600011916 · MahaRERA · https://gethorizon.in/projects/amrut-manthan-appartment-nashik-e2v45ai8

01

Complete project overview

MahaRERA · Registration filing
Project name
AMRUT MANTHAN APPARTMENT
Units
20 units
Mix
20 × 2 BHK
Carpet area
47–48 sq mper-unit range, as filed
Floors
6
Parking
14 spaces
Land area
764 sq m
Sanctioned built-up
1,070 sq m

Timeline

RERA registeredAug 2017
Proposed completionSep 2018
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

20 units across 4 batches
TypeArea sq mCount
2 BHK474
2 BHK484
2 BHK484
2 BHK488

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

J V ASSOCIATES

PartnershipPromoter type
Nashik, MAHARASHTRABased in
1Projects
1City
2017–2018Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Nashik
Taluka
Nashik
District
Nashik
Pincode
422006
Survey no.
31/4 PLUS 7 WADALA SHIVAR PLOT NO 7 AND 8
North boundary
S NO 119 PART
East boundary
S NO 119
South boundary
PLOT NO 6
West boundary
COLONY ROAD
What’s nearby
SchoolsNo schools within 2km · College or university 1.8km away
HealthcareHospital 1.9km away · 3 clinics within 1km
LifestylePark 580m away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.9 kmPrimary road 1.7 km · Jogeshwari Vikhroli Link RoadRailway line 2.5 kmMetro station 2.0km away (Goregaon (East))Limited bus connectivity nearby
Water & environment
Water body 927 m · Chota Kashmir Lake
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹26,213per sq yd
₹31,350per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 14 divisions of “Nashik” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,213₹70,912 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

4,179 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,034 projects the radar draws within 6 km — every kind, every stage — 665 are residential projects still under way. This list keeps only those, and looks further out.

25 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Transcon Triumph Tower 3

Transcon Triumph Phase 2 Private Limited · Andheri

Aug 2021registered
Sep 2026target completion
Scale316 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

CODENAME RARE BY RUNWAL

Runwal Developers Ltd · Andheri

Apr 2022registered
Jun 2026target completion
Scale68 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

SENROOFS PHASE - III

PIONEER HOUSING · Kurla

Dec 2021registered
Dec 2027target completion
Scale380 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

THE SANCTUARY - TOWER 2

Runwal Construction Private Limited · Kurla

Jan 2022registered
Mar 2027target completion
AuthorityMahaRERA
10 m awayResidential / Group Housing

INA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED

YASH REALTORS · Borivali

Feb 2022registered
Dec 2026target completion
Scale16 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Avyukta Neelkamal

Shivoham Associates · Borivali

May 2022registered
Sep 2026target completion
1 open complaintScale151 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.