This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
100 units
Mix
69 × 2 BHK · 29 × 3 BHK · 2 × 3nhalfbhk
Carpet area
76–131 sq mper-unit range, as filed
Floors
36
Parking
8 spaces
Land area
6,136 sq m
Sanctioned built-up
13,035 sq m
Recreational open space
867 sq m
Timeline
RERA registeredAug 2017
Proposed completionDec 2020
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
100 units across 4 batches
TypeArea sq mCount
3nhalfbhk1312
2 BHK7637
3 BHK9429
2 BHK7632
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400067
Survey no.
CTS NO 128 A 45
North boundary
CTS no A 45pt
East boundary
18 mtr wide exisiting DP road
South boundary
CTS no 1009 1010
West boundary
CTS no 128A 45 pt
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.0km away
HealthcareHospital 284m away · 9 clinics within 1km
LifestylePark 676m away · Gym or sports centre 758m away · 13+ restaurants and cafes within 1km
Expressway 2.5 km · Western Express HighwayPrimary road 412 m · Link RoadRailway line 1.4 km · Western Railway Virar to BorivaliMetro station 539m away (Dahanukarwadi)Bus stop within 500m
Water & environment
Water body 244 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,811 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,187 projects the radar draws within 6 km — every kind, every stage — 740 are residential projects still under way. This list keeps only those, and looks further out.