KAVYA SHREE LAXMI

P51800006272 · MahaRERA · https://gethorizon.in/projects/kavya-shree-laxmi-borivali-r46gdpcr

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Floors
17
Parking
32 spaces
Land area
751 sq m
Sanctioned built-up
769 sq m

Timeline

RERA registeredAug 2017
Proposed completionJun 2021
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

KAVYA KCD DEVELOPERS

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2017–2021Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Borivali
Taluka
Borivali
District
Mumbai Suburban
Pincode
400067
Survey no.
C.T.S. No. 1C/1/283, Plot no. 223
North boundary
NALANDA BUILDING
East boundary
7 M WIDE NALLA
South boundary
RATNADEEP CO OP HOUSING SOC LTD
West boundary
18 30 M WIDE RDP 5 ROAD
What’s nearby
SchoolsNearest school 1.2km away · College or university 1.3km away
HealthcareHospital 49m away · 5 clinics within 1km
LifestylePark 651m away · Gym or sports centre 1.1km away · 9 restaurants and cafes within 1km
ShoppingSupermarket 1.0km away · Mall 1.1km away · Bank 375m away
Getting around
Expressway 2.9 km · Western Express HighwayPrimary road 7 m · Goregaon Link RoadRailway line 1.8 km · Western Railway Virar to BorivaliMetro station 112m away (Dahanukarwadi)Bus stop within 1km
Water & environment
Water body 521 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Bmc

Building Permit
Survey no. C.T.S. No. 1C/1/283, Plot no. 223

The promised possession date (30 Jun 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Bmc

Planning authority

Has approved 46 RERA projects0.2% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
46
On record
1,091 flats · 0 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,009 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 2,182 projects the radar draws within 6 km — every kind, every stage — 798 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

36 projects within 1 km — showing the nearest 6.

10 m awayOthers

Shreyaan Residency

VIDISHA REAL ESTATE DEVELOPERS PVT LTD · Borivali

May 2022registered
Sep 2027target completion
Scale52 flatsAuthorityMahaRERA
10 m awayOthers

WESTWOOD-2

DIMPLE REALTORS PRIVATE LIMITED · Borivali

May 2022registered
Dec 2030target completion
Scale184 flatsAuthorityMahaRERA
10 m awayMixed

West Center Meridian Court

Vijaykamal Properties Pvt Ltd · Borivali

Sep 2025registered
Dec 2030target completion
Scale34 flatsAuthorityMahaRERA
110 m awayOthers

Arthaya

SRI ARTHA BUILDTECH PRIVATE LIMITED · Kandivali · Borivali

Jul 2023registered
Apr 2028target completion
Government Guidance Rate₹1,31,983/sq ydAuthorityMahaRERA
120 m awayMixed

JAY CO-OPERATIVE HOUSING SOCIETY LIMITED

MS DEVELOPERS · Kandivali · Borivali

Oct 2025registered
Dec 2028target completion
Government Guidance Rate₹1,31,983/sq ydScale44 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

ALOK

Shree Dhanesh Buildcon · Kandivali · Borivali

Oct 2024registered
Sep 2026target completion
Government Guidance Rate₹1,31,983/sq ydScale31 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.