HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Annapurna Sankul

P53000029938 · MahaRERA · https://gethorizon.in/projects/annapurna-sankul-kolhapur-m-corp-karvir-7dkyldde

01

Complete project overview

MahaRERA · Registration filing
Project name
Annapurna Sankul
Units
20 units
Mix
8 × 2 BHK · 6 × Office · 4 × Shop · 2 × 1 RK
Carpet area
4–67 sq mper-unit range, as filed
Floors
7
Parking
3 spaces
Land area
306 sq m
Sanctioned built-up
643 sq m

Timeline

RERA registeredJul 2021
Proposed completionDec 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

20 units across 15 batches
TypeArea sq mCount
Shop91
Office171
Office132
Shop61
1 RK122
Shop201
2 BHK572
2 BHK523
2 BHK581
Office111
Office41
Office171
2 BHK671
2 BHK461
Shop181

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Shirke More Builders and Developers

PartnershipPromoter type
Kolhapur, MAHARASHTRABased in
3Projects
1City
2019–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
50 homeson the public record across 3 projects
2,868 sq mbuilt-up filed
1,365 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Shirke More Builders and Developers— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 49 new projects last year
  • 460 nearby projects
≈ locality centre · geocoded, verified · 16.7002, 74.2222 · © OpenStreetMap contributors
Village
Kolhapur (M Corp.)
Taluka
Karvir
District
Kolhapur
Pincode
416002
Survey no.
2424 A and B and C
North boundary
Lane
East boundary
12 mtr road
South boundary
9 mtr road
West boundary
CTS No 2425
What’s nearby
SchoolsNearest school 1.2km away
HealthcareHospital 150m away · 2 clinics within 1km
LifestylePark 2.0km away · Swimming pool within 2km
ShoppingSupermarket 1.3km away · Mall 566m away
Getting around
Expressway 227 m · Station RaodPrimary road 545 m · Bawada RoadRailway line 1.5 kmRailway station 1.7km away (Shri Chatrapati Shahu Maharaj Terminus)Limited bus connectivity nearby
Water & environment
River 545 m · Jayanti NalaWater body 1.7 km · Kotiteerth Lake
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹38,654per sq yd
₹46,230per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 12 divisions of “Kolhapur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹32,860₹61,271 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

215 residential projects still under way within 25 km. Step out ring by ring:

Of the 460 projects the radar draws within 6 km — every kind, every stage — 194 are residential projects still under way. This list keeps only those, and looks further out.

7 projects within 1 km — showing the nearest 6.

KolhapurResidential / Group Housing

TIRUMALA RESIDENCY PIWALAWADA

Mahalaxmi Infrastructures

Aug 2024registered
Dec 2028target completion
Government Guidance Rate₹38,654/sq ydScale12 flatsAuthorityMahaRERA
KolhapurResidential / Group Housing

Indira Heights

Mukund Manohar Joshi

Jun 2024registered
Dec 2026target completion
Government Guidance Rate₹38,654/sq ydScale15 flatsAuthorityMahaRERA
KolhapurResidential / Group Housing

MahaLaxmi Krushnangan

RAJSHRI SATISH KULKARNI

May 2024registered
Nov 2026target completion
Government Guidance Rate₹38,654/sq ydScale42 flatsAuthorityMahaRERA
KolhapurResidential / Group Housing

Karveer Nivasini Residency

S R Real Estate Developers

Aug 2017registered
Nov 2026target completion
Government Guidance Rate₹38,654/sq ydScale98 flatsAuthorityMahaRERA
KolhapurOthers

Salgar Heights

Sunil Dinkar Salgar

Dec 2021registered
Dec 2026target completion
Government Guidance Rate₹38,654/sq ydScale44 flatsAuthorityMahaRERA
KolhapurResidential / Group Housing

SHARAD PRIDE 41

PRATIK INFRA

Jun 2026registered
Apr 2030target completion
Government Guidance Rate₹38,654/sq ydScale23 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the locality centre, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/annapurna-sankul-kolhapur-m-corp-karvir-7dkyldde.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.