HORIZON
Share

GATEWAY RESIDENTIAL

P51800046773 · MahaRERA · https://gethorizon.in/projects/gateway-residential-andheri-cajv409d

01

Complete project overview

MahaRERA · Registration filing
Units
34 units
Floors
11
Buildings
6
Parking
133 spaces
Land area
2,748 sq m
Sanctioned built-up
6,625 sq m

Timeline

RERA registeredSep 2022
Proposed completionSep 2027
TodaySep 2026
Construction progress
Podiums0%
Solid Waste Manage…0%
Energy managemcnt0%
Street Lighting70%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Internal Roads & F…100%
Water Supply100%
Sewerage (Chamber,…100%
Storm Water Drains100%
Landscaping & Tree…100%
Treatment And Disp…100%
Water conservation…100%
Fire protection an…100%
Electrical meter r…100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

LUCRATIVE TRADING LLP

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
2Projects
1City
2022–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
44 homeson the public record across 2 projects
8,521 sq mbuilt-up filed
5,496 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from LUCRATIVE TRADING LLP— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400054
Survey no.
23
North boundary
SANTACRUZ
East boundary
S V ROAD
South boundary
JUHU TARA ROAD
West boundary
SANTZCRUZ TO VILLAGE BANDRA G
What’s nearby
Schools4 schools within 1km · 4 educational institutions within 1km
HealthcareHospital 451m away · 7 clinics within 1km · Pharmacy within 500m
LifestylePark 1.6km away · Gym or sports centre 234m away · 10+ restaurants and cafes within 1km
ShoppingSupermarket 237m away · Bank 319m away · ATM within 500m
Getting around
Expressway 1.4 kmPrimary road 575 m · Swami Vivekanand RoadRailway line 989 mRailway station 1.0km away (Santa Cruz)4 bus stops within 500m
Water & environment
Water body 222 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 23
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,612 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,983 projects the radar draws within 6 km — every kind, every stage — 733 are residential projects still under way. This list keeps only those, and looks further out.

43 projects within 1 km — showing the nearest 6.

VileparleOthers

Vascon Orchids

Vascon Engineers Ltd

Jan 2025registered
Sep 2028target completion
Scale112 flatsAuthorityMahaRERA
BandraResidential / Group Housing

DLH DAWN

Dev Land & Housing Pvt Ltd

Feb 2024registered
Jan 2027target completion
AuthorityMahaRERA
AndheriResidential / Group Housing

Armaan

M/s. Poonam Habitat LLP

Nov 2025registered
Dec 2030target completion
Scale13 flatsAuthorityMahaRERA
VileparleResidential / Group Housing

MOHINI ENGINEERS AND CONTRACTORS

HARIS GULABRAI CHAWLA

Aug 2024registered
Dec 2027target completion
Scale45 flatsAuthorityMahaRERA
VileparleResidential / Group Housing

Spectrum Life

TSV SANTACRUZ REALTY LLP

Jan 2025registered
Dec 2028target completion
Scale63 flatsAuthorityMahaRERA
BandraMixed

AUM AURA

M/S AUM SERENITY

Aug 2025registered
Jul 2027target completion
Scale15 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.