HORIZON
Share

KESAR LEOR

P51800078150 · MahaRERA · https://gethorizon.in/projects/kesar-leor-ghatkopar-kurla-flp0356e

01

Complete project overview

MahaRERA · Registration filing
Units
33 units
Floors
8
Buildings
2
Parking
16 spaces
Land area
658 sq m
Sanctioned built-up
1,549 sq m

Timeline

RERA registeredNov 2024
Proposed completionAug 2025
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Fire protection an…0%
Electrical meter r…0%
OC-readiness45%
Flat fit-out80%
Internal finishes90%
Stairs & lifts92%
External finishes92%
Excavation100%
Plinth100%
Stilt floor100%
Superstructure100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

M S REALTORS

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2024–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Ghatkopar
Taluka
Kurla
District
Mumbai Suburban
Pincode
400086
Survey no.
C.T.S. No. 1627 to 1640 and 1651A
North boundary
DILIP KUNJ
East boundary
SHREE SAI SIDDHI
South boundary
SHREE SAI SIDDHI
West boundary
JIVDAYA LANE EXISTING ROAD
What’s nearby
Schools1 school within 1km
HealthcareHospital 20m away · 21 clinics within 1km · Doctor's clinic within 1km
LifestylePark 997m away · Gym or sports centre 987m away · 16+ restaurants and cafes within 1km
ShoppingSupermarket 903m away · Bank 355m away
Getting around
Expressway 1.6 km · Kamraj Nagar FlyoverPrimary road 10 m · Lal Bahadur Shastri MargRailway line 392 m · Central Railways Slow LineRailway station 427m away (Ghatkopar)11 bus stops within 500m
Water & environment
Water body 1.7 km · Trombay Creek
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹1,35,871per sq yd
₹1,62,500per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Ghatkopar”.
In force
2026-2027 schedule
Spread
₹67,827₹2,00,972 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. C.T.S. No. 1627 to 1640 and 1651A

The promised possession date (31 Aug 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,704 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,923 projects the radar draws within 6 km — every kind, every stage — 614 are residential projects still under way. This list keeps only those, and looks further out.

46 projects within 1 km — showing the nearest 6.

Mumbai CityOthers

ROCKLINE PROPERTIES

ROCKLINE PROPERTIES AND DEVELOPERS PRIVATE LIMITED

Feb 2023registered
Dec 2027target completion
Scale535 flatsAuthorityMahaRERA
KurlaOthers

W2.O by Sandu Developers Phase II

Sandu Developers

Nov 2024registered
Dec 2028target completion
1 open complaintScale86 flatsAuthorityMahaRERA
KirolResidential / Group Housing

MAHAVIR ZEN

CHANDRAKANT AND CO

Dec 2025registered
Dec 2027target completion
Government Guidance Rate₹1,29,366/sq ydScale7 flatsAuthorityMahaRERA
KurlaOthers

SKYLINE TUNIS BLDG NO 4 WING E

SKYLINE RESIDENCY LLP

Aug 2017registered
Dec 2028target completion
Scale63 flatsAuthorityMahaRERA
KurlaResidential / Group Housing

SARVONNATI CHS LTD

JAI ENTERPRISES

Aug 2017registered
Dec 2026target completion
Scale117 flatsAuthorityMahaRERA
KurlaResidential / Group Housing

Neelyog Aarana

NEELYOG BUILDERS PRIVATE LIMITED

Nov 2023registered
Jun 2028target completion
Scale152 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.