2 extensions on record — latest to 31 Oct 2022declared reason: force majeure
Description
Since the property situated at Plot No. 01, Kuber Complex Scheme, Gandhi Path, Vaishali Nagar, Jaipur, on which the promoter is planning to develop and construct the project "Mall of Jaipur", was auctioned in favour of the promoter by Jaipur Development Authority and as per Point 11 of Auction Terms & Conditions of the said property (Copy attached under head "Project Approval Document" of "Documents Tab"), the promoter is not required to get the maps approved before starting the construction on the said property and is required to submit an Affidavit in this regard to the concerned authorities (Copy of Affidavit also attached under head Project Approval Document" of "Documents Tab"). The Promoter has complied with the conditions mentioned in the Point 11 of Auction Terms & Conditions of the said property and the related documents have been duly uploaded in the RERA Application under the tab "Documents". Also, even though the promoter is not required to get the maps approved as per point 11 of Auction Terms & Conditions, the promoter has applied for the maps approval, copy of which is also attached under head "Project Approval Document" of "Documents Tab". Further, as per Pt. No. 5 of Circular No. क्रमांक प.18(25) नविवि/सामान्य/2014 dated 27.06.2017 and Pt. No. 2 of Circular No. क्रमांक प.10(7) नविवि/3/2009 पार्ट-III dated 22.06.2017 issued by Urban Development & Housing Department (Copy of the same attached under head Project Approval Document" of "Documents Tab") regarding Fire NOC & EC respectively, at the construction stage, instead of submitting Fire NOC and EC, the promoter is only required to submit an Affidavit in this regard (Copy of the same attached under head Project Approval Document" of "Documents Tab"). However, the promoter has applied for both Fire NOC & EC, the applications of which are also attached under “Documents” tab. Contractor details, Encumbrances updated on portal on 27.01.2020. Promoter details updated 28.01.2020. Promoter has obtained the permanent FIRE noc.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 896 m · FlyoverPrimary road 3.2 kmRailway line 3.0 kmMetro station 3.2km away (Manasarovar)Bus stop within 500m
Water & environment
Water body 77 m · Fountain RD
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹203.96 Cr declared. What that works out to:
31%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 14 Sep 2017 · 9 yrs ago
The promised possession date (31 Oct 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
15 commercial projects still under way within 25 km. Step out ring by ring:
Of the 457 projects the radar draws within 6 km — every kind, every stage — 5 are commercial projects still under way. This list keeps only those, and looks further out.