Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
35 units across 10 batches
TypeArea sq mCount
1 BHK4410
1 BHK459
2 BHK679
Shop341
Shop341
Shop261
Shop181
Shop281
Shop301
Shop431
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 104m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 932m away · Gym or sports centre 1.9km away · 11+ restaurants and cafes within 1km
ShoppingSupermarket 32m away · Bank 118m away · ATM within 500m
Getting around
Expressway 1.2 kmPrimary road 17 m · Lal Bahadur Shastri MargRailway line 993 mRailway station 1.4km away (Vidyavihar)9 bus stops within 500m
Water & environment
Water body 271 m · Sheetal Talao/ Chatrapati Shivaji Maharaj Talao
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Municipal Corporation of Greater Mumbai
Municipal Corporation · MCGM
Building Permit
Survey no. 135
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation of Greater Mumbai
Municipal corporation
Has approved 2,862 RERA projects — about 1 in 7 in Maharashtra, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,302 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,602 projects the radar draws within 6 km — every kind, every stage — 845 are residential projects still under way. This list keeps only those, and looks further out.
14 projects within 1 km — showing the nearest 6.
10 m awayResidential / Group Housing
Sai Shrusti CHS
Shree Swami Samarth Buildcon · Bhandup · Kurla
3 yr 10 mo
Feb 2024registered
Dec 2027target completion
Government Guidance Rate₹1,46,239/sq ydScale44 flatsAuthorityMahaRERA