HORIZON
Share

Kalyan Kutir Co-operative Housing Society Limited

P51800048180 · MahaRERA · https://gethorizon.in/projects/kalyan-kutir-co-operative-housing-kurla-8lwsv8ig

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Kalyan Kutir Co-operative Housing Society Limited
Floors
7
Buildings
2
Parking
20 spaces
Land area
455 sq m
Sanctioned built-up
424 sq m

Timeline

RERA registeredDec 2022
Proposed completionDec 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Asra Constructions

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400070
Survey no.
CTS No. 139, 139 / 1 to 6
North boundary
Land Bearing CTS No 140
East boundary
LBS Road
South boundary
Land Bearing CTS No 138
West boundary
Land Bearing CTS No 147
What’s nearby
Schools1 school within 1km
HealthcareHospital 482m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 1.1km away · 9 restaurants and cafes within 1km
ShoppingSupermarket 400m away · Bank 43m away · ATM within 500m
Getting around
Expressway 111 m · Santa Cruz – Chembur Link RoadPrimary road 91 m · Lal Bahadur Shastri MargRailway line 974 mRailway station 1.1km away (Kurla)3 bus stops within 500m
Water & environment
River 447 m · Mithi River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. CTS No. 139, 139 / 1 to 6

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,177 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,790 projects the radar draws within 6 km — every kind, every stage — 915 are residential projects still under way. This list keeps only those, and looks further out.

43 projects within 1 km — showing the nearest 6.

WashindOthers

ROYAL PALM PHASE - 1

SIDDHI DEVELOPERS

Jul 2023registered
Jun 2027target completion
Scale95 flatsAuthorityMahaRERA
OthersResidential / Group Housing

DHARTI HEIGHTS

Om Shanti Housing

May 2022registered
Dec 2026target completion
Government Guidance Rate₹2,10,988/sq ydScale77 flatsAuthorityMahaRERA
ThaneResidential / Group Housing

Code Name-Enchanted

Runwal Construction Private Limited

Mar 2022registered
Jun 2028target completion
1 open complaintGovernment Guidance Rate₹60,034/sq ydScale673 flatsAuthorityMahaRERA
LOWER PAREL WESTOthers

THE AURO

ALAMDAR INFRASTRUCTURE PVT LTD

Mar 2022registered
Nov 2027target completion
Scale24 flatsAuthorityMahaRERA
Mumbai CityResidential / Group Housing

VICEROY BY GROUP SATELLITE

SATELLITE DEVELOPERS PRIVATE LIMITED

May 2022registered
Mar 2027target completion
Scale86 flatsAuthorityMahaRERA
BYCULLAMixed

WHITE FLOWER RESIDENCY

WHITE FLOWERS REALTY LLP

Jun 2022registered
Dec 2026target completion
Scale162 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.