HORIZON
Share

SAYBA ARCADIA

P51800055257 · MahaRERA · https://gethorizon.in/projects/sayba-arcadia-kurla-dtc3ctwj

01

Complete project overview

MahaRERA · Registration filing
Units
117 units
Floors
8
Buildings
8
Parking
22 spaces
Land area
1,221 sq m
Sanctioned built-up
4,981 sq m

Timeline

RERA registeredMar 2024
Proposed completionMar 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

STAR EMPIRE

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2024–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400070
Survey no.
917
North boundary
Sahadri CHSL
East boundary
12 20 mtr wide MHADA layout Road
South boundary
18 30 mtr wide MHADA layout Road
West boundary
Nalla
What’s nearby
Schools1 school within 1km
HealthcareHospital 304m away · 1 clinic within 1km · Pharmacy within 1km
LifestylePark 1.5km away · Gym or sports centre 1.4km away · 8 restaurants and cafes within 1km
ShoppingSupermarket 548m away · Bank 620m away · ATM within 500m
Getting around
Expressway 118 m · Santa Cruz – Chembur Link RoadPrimary road 758 m · Lal Bahadur Shastri MargRailway line 285 m · Central LineRailway station 850m away (Kurla)Bus stop within 1km
Water & environment
Water body 609 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Maharashtra Housing and Area Development Authority (MHADA)

Housing Authority
Building Permit
Survey no. 917

The promised possession date (31 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Maharashtra Housing and Area Development Authority (MHADA)

Planning authority

Has approved 438 RERA projects2.2% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
341
On record
13,458 flats · 0 plots
Reach
18 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,266 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,641 projects the radar draws within 6 km — every kind, every stage — 835 are residential projects still under way. This list keeps only those, and looks further out.

52 projects within 1 km — showing the nearest 6.

140 m awayResidential / Group Housing

Taiba Residency

H M International · Kurla

Aug 2026registered
Dec 2029target completion
Scale34 flatsAuthorityMahaRERA
200 m awayMixed

Sayba Badr

Star Shine · Kurla

May 2026registered
Jun 2029target completion
Scale349 flatsAuthorityMahaRERA
380 m awayResidential / Group Housing

REHMANIYA APARTMENTS

S & S ENTERPRISES · Kurla

Jan 2025registered
Dec 2026target completion
Scale83 flatsAuthorityMahaRERA
450 m awayResidential / Group Housing

KURLA VIJAY CHS LTD

URBAN BUILD HOMES · Kurla

Feb 2026registered
Dec 2028target completion
Scale20 flatsAuthorityMahaRERA
450 m awayResidential / Group Housing

PLATINUM SQUARE

N I ENTERPRISES · Kurla

Sep 2025registered
Dec 2027target completion
Scale23 flatsAuthorityMahaRERA
480 m awayOthers

SAYBA ELYSIA

SAYBA HOME MAKERS · Kurla

Dec 2024registered
Jul 2027target completion
Scale326 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.