HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

MORAJ PRIDE

P51700008474 · MahaRERA · https://gethorizon.in/projects/moraj-pride-navi-mumbai-m-corp-thane-w2lbgo25

01

Complete project overview

MahaRERA · Registration filing
Project name
MORAJ PRIDE
Units
73 units
Mix
43 × 1 BHK · 24 × 2 BHK · 6 × Shop
Carpet area
17–37 sq mper-unit range, as filed
Floors
14
Parking
28 spaces
Land area
1,597 sq m
Sanctioned built-up
2,392 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2021
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

73 units across 24 batches
TypeArea sq mCount
Shop211
1 BHK2519
1 BHK261
1 BHK271
1 BHK261
1 BHK271
1 BHK282
1 BHK289
1 BHK261
1 BHK241
Shop232
2 BHK371
1 BHK287
Shop171
2 BHK371
Shop231
Shop211
2 BHK371
2 BHK371
2 BHK379
2 BHK371
2 BHK371
2 BHK377
2 BHK372

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

MORAJ INFRATECH PRIVATE LIMITED

CompanyPromoter type
Thane, MAHARASHTRABased in
3Projects
3Cities
2017–2022Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
228 homeson the public record across 3 projects
14,841 sq mbuilt-up filed
7,261 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MORAJ INFRATECH PRIVATE LIMITED— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 66 new projects last year
  • 967 nearby projects
1 km radius · coordinates as filed · 18.9711, 73.0202 · © OpenStreetMap contributors
Village
Navi Mumbai (M Corp.)
Taluka
Thane
District
Thane
Pincode
400706
Survey no.
76
North boundary
PROP 15 M WIDE ROAD
East boundary
PLOT N0-77 AND 78
South boundary
PLOT NO-75 AND PLOT NO-79
West boundary
PLOT NO-75 AND PROP 15 M ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 4.0km away
LifestyleNo parks within 2km · Gym or sports centre 1.7km away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.6 km · Ulwe FlyoverPrimary road 2.2 km · Panvel Uran RoadRailway line 137 m · Uran LineNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 176 mCanal 198 m
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

Open ground within ~23 m of the recorded location until 2018; a building is first visible in 2019 and is about 42 m tall by 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~23 m of the filed location.

Satellite photographs of the same ground

Feb 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2019.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
  • Site is a ~23 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • Coordinate sits 3-10 km from other projects with the same pincode.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

07

Other projects nearby

The register · within 25 km

3,176 residential projects still under way within 25 km. Step out ring by ring:

Of the 967 projects the radar draws within 6 km — every kind, every stage — 268 are residential projects still under way. This list keeps only those, and looks further out.

45 projects within 1 km — showing the nearest 6.

170 m awayOthers

99 SILVER OAKS

BOMBAY CONSTRUCTION & INFRAPROJECTS PVT LTD · Ulawe · Panvel

Jun 2024registered
Dec 2031target completion
Scale108 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

PRITHVI AARNA

PRITHVI MULTIPROJECTS LLP · Ulawe · Panvel

Dec 2023registered
Dec 2026target completion
Scale52 flatsAuthorityMahaRERA
270 m awayResidential / Group Housing

Neels West Wind

Neel Realtors · Ulawe · Panvel

Aug 2022registered
Dec 2026target completion
Scale104 flatsAuthorityMahaRERA
270 m awayResidential / Group Housing

VAIKUNTH BLISS

DIVYESH DILIPBHAI NAKRANI · Ulawe · Panvel

Jun 2024registered
Dec 2026target completion
Scale42 flatsAuthorityMahaRERA
290 m awayOthers

GURU ANMOL

BHUMIKAR INFRA LLP · Navi Mumbai · Thane

Apr 2025registered
Dec 2030target completion
Scale82 flatsAuthorityMahaRERA
400 m awayResidential / Group Housing

HILL CREST

SH BUILDCON · Ulawe · Panvel

Mar 2025registered
Dec 2029target completion
Scale126 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/moraj-pride-navi-mumbai-m-corp-thane-w2lbgo25.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.