The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Ghatkopar
Taluka
Kurla
District
Mumbai Suburban
Pincode
400086
Survey no.
CTS NO 150 PART, 151, 151/1 TO7, 152, 152/ 1 TO 7, 153, 153/6 PART, 153/7 PART, 153/8, 153/9, 154 PART, 154/11 PART AND 154/12, 162/B PART, 162/B/16 TO 27 AND 351 PART
North boundary
ANDHERI GHATKOPAR LINK ROAD AND METRO RAIL
East boundary
CTS NO 148 PT AND 149 PT
South boundary
PLOT OF GOVERNMENT LAND BEARING CTS NO 351 PART
West boundary
CTS NO 162 PT AND 351 PT
What’s nearby
Schools1 school within 1km
HealthcareHospital 65m away · 3 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.2km away · Gym or sports centre 2.0km away
ShoppingSupermarket 753m away · Bank 732m away
Getting around
Expressway 2.6 km · Eastern Express HighwayPrimary road 45 m · Sant Shitolebaba Maharaj MargRailway line 1.3 km · Central Railways Slow LineRailway station 1.4km away (Ghatkopar)Bus stop within 500m
Water & environment
Canal 953 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. CTS NO 150 PART, 151, 151/1 TO7, 152, 152/ 1 TO 7, 153, 153/6 PART, 153/7 PART, 153/8, 153/9, 154 PART, 154/11 PART AND 154/12, 162/B PART, 162/B/16 TO 27 AND 351 PART
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,585 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,273 projects the radar draws within 6 km — every kind, every stage — 735 are residential projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
570 m awayMixed
RAJANIGANDHA COTTAGE CO-OPERATIVE HOUSING SOCIETY LTD
JYOTI REAL-TECH PRIVATE LIMITED · Kirol · Kurla
3 yr 9 mo
Mar 2026registered
Dec 2029target completion
Government Guidance Rate₹1,18,003/sq ydScale37 flatsAuthorityMahaRERA