HORIZON
Share

PABITARA APARTMENT BLOCK-1

RERAA KM 61 OF 2023-2024 · RERA Assam · https://gethorizon.in/projects/pabitara-apartment-block-1-guwahati-kamrup-metro-4f5oqsil

Registration lapsed

This project’s RERA Assam registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with RERA Assam before you rely on anything below.

01

Complete project overview

RERA Assam · Registration filing
Project name
PABITARA APARTMENT BLOCK-1
Registration category
NEWnew vs ongoing at registration
Apartments / villas
473 units
Land area
1,165 sq m
Local land measure
4K 7L
RERA validity
31 Dec 2024this validity has passed

Timeline

RERA registeredSep 2018
Proposed completionDec 2024
TodaySep 2026
02

Builder’s track record

RERA Assam · Builder registration

L.G. CONSTRUCTION

Firm/ Proprietorship FirmPromoter type
1Projects
1City
2018–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Assam · Registration filing
District
KAMRUP METRO
Mouza / circle
GUWAHATI
Town / village
GUWAHATI
Landmark
NEAR MARIA'S PUBLIC SCHOOL
Site address
NARENGI CHANDRAPUR ROAD, NEAR MARIA'S PUBLIC SCHOOL
Pincode
781026
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 3.2km away · 2 clinics within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.8km away
ShoppingSupermarket 675m away
Getting around
Primary road 56 mRailway line 105 mRailway station 268m away (Narengi)Limited bus connectivity nearby
Water & environment
River 161 mWater body 1.0 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.28 Cr declared to build 473 flats. What that works out to:

₹1.12 Lakhdeclared cost per flatall-in — land + construction

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Assam registration department

No government guidance rate is shown for this project.

Assam's government guidance rates aren't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

RERA Assam · Approved building plan

Guwahati Municipal Corporation

Municipal Corporation
Building Permitapproved 5 Sep 2018 · 8 yrs ago

The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Guwahati Municipal Corporation

Municipal corporation / board

Has approved 604 RERA projectsabout 1 in 1 in Assam, more than any other body in the state.

an apartments market98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.

Builders
488
On record
45,695 flats · 10,758 plots
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Assam

07

Other projects nearby

The register · within 25 km

242 residential projects still under way within 25 km. Step out ring by ring:

Of the 206 projects the radar draws within 6 km — every kind, every stage — 59 are residential projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

GUWAHATIMixed Type

TRINITY ATMOS

TRINITY PROJECTS (SURVEY)

May 2025registered
Mar 2028target completion
Declared cost₹10.33 CrScale31 flatsAuthorityRERA Assam
GUWAHATIResidential

AANANDAM PLAZA

P.B. ENTERPRISE

Jan 2025registered
Oct 2028target completion
Declared cost₹4.70 CrScale14 flatsAuthorityRERA Assam

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Assam does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Assam does not publish a complaints register. This read cannot speak to them either way.