This project’s RERA Assam registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with RERA Assam before you rely on anything below.
01
Complete project overview
RERA Assam · Registration filing
Registration category
ONGOINGnew vs ongoing at registration
Land area
1,180 sq m
Local land measure
0 bigha,4 katha,8.2 lecha
RERA validity
21 Aug 2023this validity has passed
Timeline
RERA registeredAug 2019
Proposed completionAug 2023
TodaySep 2026
Construction progress
80% overall, as filed
Self-declared % complete as filed with RERA Assam when this ongoing project was registered — a snapshot at registration, not a live tracker.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
RERA Assam · Registration filing
District
KAMRUP METRO
Mouza / circle
GUWAHATI
Town / village
North Lakhimpur
Site address
PUB JYOTI NAGAR , GUWAHATI COLLEGE ROAD
Pincode
787001
What’s nearby
Schools1 school within 1km · College or university 1.3km away · Library 1.4km away
HealthcareHospital 1.6km away · 1 clinic within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.5km away · 6 restaurants and cafes within 1km
ShoppingSupermarket 899m away · Mall 688m away · Convenience store within 1km
Getting around
Primary road 137 m · Maniram Dewan RoadRailway line 306 mRailway station 666m away (New Guwahati)Limited bus connectivity nearby
Location — done
04
Government Guidance Rate
Assam registration department
No government guidance rate is shown for this project.
Assam's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Assam · Approved building plan
approved 30 Jun 2018 · 8 yrs ago
Building Permit no. GPL/BP/23/1405/04092015
The promised possession date (21 Aug 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan GPL/BP/23/1405/04092015 on the approving authority’s portal to confirm the approval.
Planning authority — done
06
Complaints & litigation
RERA Assam · public record
Complaints register
Not published. RERA Assam doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Assam
Litigation
None declared in this filing
Only what the builder declared, or what RERA Assam records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Assam, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
373 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 394 projects the radar draws within 6 km — every kind, every stage — 146 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.