HORIZON
Share

PALASH

P51800053688 · MahaRERA · https://gethorizon.in/projects/palash-malvani-borivali-47m5k2r5

01

Complete project overview

MahaRERA · Registration filing
Project name
PALASH
Units
67 units
Floors
10
Buildings
2
Parking
36 spaces
Land area
1,295 sq m
Sanctioned built-up
2,926 sq m
Recreational open space
198 sq m

Timeline

RERA registeredNov 2023
Proposed completionDec 2025
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
OC-readiness80%
Stairs & lifts90%
External finishes90%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

CHAMUNDESHWARI INFRASTRUCTURE PRIVATE LIMITED

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2023–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Malvani
Taluka
Borivali
District
Mumbai Suburban
Pincode
400092
Survey no.
9/5
North boundary
CTS 5
East boundary
CTS 9 6
South boundary
CTS 9 11
West boundary
CTS 9 4
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km · College or university 1.4km away
HealthcareHospital 280m away · 7 clinics within 1km
Lifestyle1 park within 500m · Gym or sports centre 614m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Mall 506m away
Getting around
Expressway 20 m · Western Express HighwayPrimary road 1.2 km · Swami Vivekanand RoadRailway line 1.0 km · Western Railway Virar to BorivaliMetro station 201m away (Kurar)Limited bus connectivity nearby
Water & environment
Water body 69 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹93,211per sq yd
₹1,11,480per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Malvani”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 9/5

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,024 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,218 projects the radar draws within 6 km — every kind, every stage — 749 are residential projects still under way. This list keeps only those, and looks further out.

35 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

SHIV PALACE

NAVKARMIK INFRA & DEVELOPMENT PRIVATE LIMITED · Malad · Borivali

May 2024registered
May 2027target completion
Scale12 flatsAuthorityMahaRERA
10 m awayMixed

RUDRA STARLIGHT

RT HOUSING PRIVATE LIMITED · Malad · Borivali

Oct 2025registered
Jul 2029target completion
Scale170 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Sanghvi Boulevard 97 Prism

Sanghvip Builders LLP · Malad · Borivali

May 2026registered
Dec 2030target completion
Scale98 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

SHEETAL HIRA

D G S TOWNSHIP PVT LTD · Kurar · Borivali

Jul 2024registered
Jun 2027target completion
Government Guidance Rate₹96,589/sq ydScale40 flatsAuthorityMahaRERA
100 m awayOthers

HIVE 97

AMITY CONSTRUCTIONS · Pahadi-Goregaon · Borivali

Apr 2024registered
Dec 2029target completion
Scale579 flatsAuthorityMahaRERA
110 m awayOthers

Neelyog Virat -A Wing

Neelyog Construction Pvt Ltd · Borivali

Aug 2017registered
Dec 2026target completion
Scale155 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.