1 × Shop No 102, 1 × Shop No 103, 1 × Shop No 101, 1 × Shop No 201, 1 × Shop No 202, 1 × Shop No 203, 1 × Shop No 301, 1 × Shop No 302, 1 × Shop No 303, 1 × Shop No 401, 1 × Shop No 402, 1 × Shop No 403
Saleable area
216–333 sq mper unit, as filed
Floors
4
Land area
1,087 sq m
Built-up area
3,224 sq m
Road widening
124 sq mland set aside for road widening
Timeline
RERA approvedAug 2018
Proposed completionMar 2021
TodaySep 2026
Construction progress
100% overall, as filed
Excavation100%
Basement & plinth100%
Podiums100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.
Find your flat
Filed by floor and type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
0 of 12 available
BuildingFloorTypeArea sq mAvailable
ROAD NO 12 ROHINI1Shop No 1022240 of 1
ROAD NO 12 ROHINI1Shop No 1033330 of 1
ROAD NO 12 ROHINI1Shop No 1012160 of 1
ROAD NO 12 ROHINI2Shop No 201mortgaged2160 of 1
ROAD NO 12 ROHINI2Shop No 202mortgaged2240 of 1
ROAD NO 12 ROHINI3Shop No 2033330 of 1
ROAD NO 12 ROHINI3Shop No 3012160 of 1
ROAD NO 12 ROHINI3Shop No 3022240 of 1
ROAD NO 12 ROHINI3Shop No 3033330 of 1
ROAD NO 12 ROHINI4Shop No 4012160 of 1
ROAD NO 12 ROHINI4Shop No 4022240 of 1
ROAD NO 12 ROHINI4Shop No 4033330 of 1
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the builder that any specific flat is released before relying on clear title.
787 homes · 65 plotson the public record across 18 projects
2,02,041 sq mbuilt-up filed
23,864 sq mplotted area
94,356 sq mland declared
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Greater Hyderabad Municipal Corporation (GHMC)Municipal / Corporationthis project10 of 17 projects
Hyderabad Metropolitan Development Authority (HMDA)Urban Development Authority5 of 17 projects
Directorate of Town & Country Planning (DTCP)Town & Country Planning (DTCP)2 of 17 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.8 km · Golkonda RoadPrimary road 736 m · Road No. 10Railway line 3.0 kmMetro station 2.3km away (Road No 5 Jubilee Hills)Bus stop within 500m
Water & environment
Water body 558 m
distances only — not a flood assessment
Declared external development
Water supply100%
Sewerage (Chamber,…100%
Rainwater100%
Green Strip/TOT LO…100%
Sewage100%
Rainwater100%
Fire safety100%
Electricity100%
Street lighting0%
Community Building…0%
Solid waste0%
Renewable energy0%
Aggregate area of …0%
Roads0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Location — done
04
Government Guidance Rate
Telangana registration department
In Telangana it’s called the market value — the registration department's figure, not a sale price.
No government guidance rate is shown for this project.
Hyderabad's rates are published on a separate system from the rest of Telangana, which hasn't been collected yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Telangana · Approved building plan
Greater Hyderabad Municipal Corporation (GHMC)
Municipal / Corporation
Building Permit
Survey no. 315
The promised possession date (31 Mar 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
GHMC
Municipal Corporation · Hyderabad city core
Has approved 3,102 RERA projects — about 1 in 4 in Telangana.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,994
On record
2,20,211 flats · 3,387 plots
Reach
65 mandals
Since
2016
More apartment-heavy than Telangana overall — 99% apartments here vs 66% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Telangana doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Telangana
Litigation
None declared in this filing
Only what the builder declared, or what RERA Telangana records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Telangana, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
127 commercial projects still under way within 25 km. Step out ring by ring:
Of the 430 projects the radar draws within 6 km — every kind, every stage — 24 are commercial projects still under way. This list keeps only those, and looks further out.