These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools4 schools within 1km · 10 educational institutions within 1km · College or university 514m away
HealthcareHospital 391m away · 11 clinics within 1km · Pharmacy within 500m
LifestylePark 1.0km away · Gym or sports centre 485m away · 36+ restaurants and cafes within 1km
ShoppingSupermarket 163m away · Mall 1.0km away · Convenience store within 500m
Getting around
Expressway 1.1 km · Dr Babasaheb Ambedkar Marg (Vincent Road)Primary road 339 m · Lady Jamshedji RoadRailway line 264 m · Mumbai - Delhi RailwayRailway station 420m away (Matunga Road)5 bus stops within 500m
Water & environment
Water body 1.5 km
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~20 m of the recorded location in 2016 — before this project started in 2024. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
The yearly site view ends in 2023, before this project started in 2024.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
MahaRERA · Approved building plan
Municipal Corporation of Greater Mumbai
Municipal Corporation · MCGM
Building Permit
Survey no. 231
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation of Greater Mumbai
Municipal corporation
Has approved 2,862 RERA projects — about 1 in 7 in Maharashtra, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12501905
11 Jun 2025
Roznama Approvedopen
Court cases, as declared
Declared by the builder
12 cases · 1 disposed · 9 open · 2 with no clear status
Number
Forum
Date
Status
1715
Bombay High Court · Division Bench · Mumbai
2025
Ongoingopen
1986
Bombay High Court · Division · Mumbai
2025
Ongoingopen
1615
High Court of Bombay · Division · Mumbai
2024
Ongoingopen
(L) 21918
Bombay High Court · Single Bench · Mumbai
2024
Ongoingopen
Appeal 37 of 2024
National Green Tribunal · Division · Mumbai
2024
Ongoingopen
Show 7 more
Number
Forum
Date
Status
37
National Green Tribunal · Division · Mumbai
2024
Closed
19218
Bombay High Court · Single Bench · Mumbai
2024
Ongoingopen
1735
High Court of Bombay · Single Bench · Mumbai
2023
Ongoingopen
4657
High Court of Bombay · Single Bench · Mumbai
2023
Ongoingopen
7988
High Court of Bombay
2023
not stated
50309
Supreme Court of India
2023
not stated
7504
High Court of Bombay · Division Bench · Mumbai
2020
Ongoingopen
What the builder declared
Declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
3,420 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,692 projects the radar draws within 6 km — every kind, every stage — 587 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
Complaints before MahaRERA.
Court cases, as declared by the builder, in its MahaRERA filing.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/rustomjee-180-bayview-matunga-w-wing-a-matunga-west-mumbai-city-9tzd4l6d.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.