HORIZON
Share

9 UMA ISHAAN

P51900016142 · MahaRERA · https://gethorizon.in/projects/9-uma-ishaan-matunga-mumbai-city-fdokopyw

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
9 UMA ISHAAN
Units
23 units
Mix
14 × 2 BHK · 4 × 1 BHK · 2 × 1.5 BHK · 2 × 2.5 BHK · 1 × 3 BHK
Carpet area
34–108 sq mper-unit range, as filed
Floors
19
Parking
36 spaces
Land area
724 sq m
Sanctioned built-up
2,933 sq m

Timeline

RERA registeredApr 2018
Proposed completionDec 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

23 units across 17 batches
TypeArea sq mCount
2 BHK591
1 BHK401
1 BHK381
1 BHK341
1.5 BHK451
2 BHK522
3 BHK1081
1.5 BHK481
2 BHK582
1 BHK361
2.5 BHK692
2 BHK551
2 BHK561
2 BHK563
2 BHK522
2 BHK481
2 BHK501

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

ISHAAN REALTORS

PartnershipPromoter type
Thane, MAHARASHTRABased in
2Projects
1Cities
2018–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
23 homeson the public record across 2 projects
5,113 sq mbuilt-up filed
1,375 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ISHAAN REALTORS— the full portfolio →

03

Location

MahaRERA · Registration filing
District
Mumbai City
Pincode
400019
Survey no.
Plot No. 8B-4, C.S. No. 500G/10
North boundary
GIP Mahim chord Railway
East boundary
plot 8B-3
South boundary
K A Subramanium Road
West boundary
Plot 8B-5
What’s nearby
Schools2 schools within 500m · 6 educational institutions within 1km · College or university 1.5km away
HealthcareHospital 450m away · 7 clinics within 1km · Pharmacy within 500m
LifestylePark 695m away · Gym or sports centre 1.5km away · 32+ restaurants and cafes within 1km
ShoppingSupermarket 516m away · Mall 603m away · Convenience store within 1km
Getting around
Expressway 401 mPrimary road 487 m · R.A. Kidwai MargRailway line 39 m · Central Railway (Harbour Line)Railway station 346m away (King's Circle)4 bus stops within 500m
Water & environment
Water body 1.5 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,639 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,955 projects the radar draws within 6 km — every kind, every stage — 663 are residential projects still under way. This list keeps only those, and looks further out.

34 projects within 1 km — showing the nearest 6.

270 m awayResidential / Group Housing

VERVE MANSION

SHANTI SIDDHI INFRA LLP · Mumbai City

Jun 2022registered
Dec 2027target completion
Scale99 flatsAuthorityMahaRERA
330 m awayResidential / Group Housing

Prodigy One

PRODIGY REALTY LLP · Fnorth-400019 · Ward FNorth

Oct 2025registered
Jul 2029target completion
Scale23 flatsAuthorityMahaRERA
370 m awayResidential / Group Housing

Bellissimo Matunga

Lodha Developers Limited · Sion

Feb 2023registered
Dec 2027target completion
Scale148 flatsAuthorityMahaRERA
370 m awayResidential / Group Housing

Bellissimo Matunga-Tower 2

Lodha Developers Limited · Sion

Jun 2023registered
Dec 2027target completion
Scale116 flatsAuthorityMahaRERA
370 m awayResidential / Group Housing

Bellissimo Matunga-Tower 3

Lodha Developers Limited · Sion

Jun 2023registered
Dec 2027target completion
Scale107 flatsAuthorityMahaRERA
370 m awayResidential / Group Housing

Lodha Matunga

Lodha Developers Limited · Salt Pan Division · Ward FNorth

Aug 2023registered
Apr 2028target completion
Scale58 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.