This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
96 units
Mix
84 × 3 BHK · 12 × Shop
Carpet area
39–124 sq mper-unit range, as filed
Floors
25
Parking
100 spaces
Land area
5,053 sq m
Sanctioned built-up
7,566 sq m
Recreational open space
441 sq m
Timeline
RERA registeredJul 2019
Proposed completionDec 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
96 units across 6 batches
TypeArea sq mCount
Shop392
Shop412
3 BHK9742
3 BHK8442
Shop446
Shop1242
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Kulgaon Badlapur Municipal CouncilMunicipal Council2 of 10 projects
Akole Nagar PanchayatMunicipal Council1 of 10 projects
Bishnupur MunicipalityMunicipality1 of 10 projects
City and Industrial Development Corporation (CIDCO)Development Authoritythis project1 of 10 projects
Collector Of PalgharCollector office1 of 10 projects
Kalyan Dombivli Municipal CorporationMunicipal Corporation1 of 10 projects
Nashik Municipal CorporationMunicipal Corporation1 of 10 projects
Raigad Jilha Parishad Alibag1 of 10 projects
Tahsildar, Mahasul, Roha, Raigad1 of 10 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 941m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 843m away · 4 restaurants and cafes within 1km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.7 kmPrimary road 476 m · Taloja Jail RoadRailway line 1.8 kmRailway station 1.9km away (Taloje Panchanand)Limited bus connectivity nearby
Water & environment
Water body 556 m · Kharghar Lake
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹34,448per sq yd
₹41,200per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Owe”.
In force
2026-2027 schedule
Spread
₹32,943 – ₹38,629 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
City and Industrial Development Corporation (CIDCO)
Development Authority
Building Permit
Survey no. 18
The promised possession date (28 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
City and Industrial Development Corporation (CIDCO)
Metropolitan / development authority
Has approved 885 RERA projects — about 1 in 23 in Maharashtra.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
724
On record
7,061 flats · 987 plots
Reach
5 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12503361
20 Sep 2025
Order Approveddisposed
Appeals to the Appellate Tribunal
MahaRERA's own register
1 appeal · 0 disposed · 1 open
Number
Date
Status
AT06/00610/2026from complaint CC12503361
15 Apr 2026
Hardcopy Submittedopen
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,367 residential projects still under way within 25 km. Step out ring by ring:
Of the 788 projects the radar draws within 6 km — every kind, every stage — 309 are residential projects still under way. This list keeps only those, and looks further out.
23 projects within 1 km — showing the nearest 6.
240 m awayOthers
PLATINUM PARKSYDE
PALACIO VENTURES · Kharghar · Panvel
5 yr 6 mo
Jun 2022registered
Dec 2027target completion
Government Guidance Rate₹78,680/sq ydScale117 flatsAuthorityMahaRERA