Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
287 units across 18 batches
TypeArea sq mCount
Shop191
2.5 BHK6336
Shop321
Shop251
Shop281
Shop261
2 BHK52108
Shop242
Shop242
Shop342
1 BHK4136
Shop262
1 BHK4336
Shop272
Shop271
Shop271
1 RK2236
1 BHK3318
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400024
Survey no.
115,115/1 to 12
North boundary
S G Barve Road
East boundary
Pipe Line Road
South boundary
Kurla ST Bus Depot
West boundary
Kurla ST Bus Depot
What’s nearby
SchoolsNearest school 1.2km away · College or university 1.7km away · Library 1.7km away
HealthcareHospital 478m away · 3 clinics within 1km
LifestylePark 1.1km away · Gym or sports centre 1.1km away · 8 restaurants and cafes within 1km
ShoppingSupermarket 269m away · Bank 568m away
Getting around
Expressway 273 mPrimary road 831 m · Sewri-Chembur RoadRailway line 567 mMetro station 913m away (Chembur)16 bus stops within 500m
Water & environment
Water body 356 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
6 complaints · 5 disposed · 1 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000056871
22 May 2019
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
4,202 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,306 projects the radar draws within 6 km — every kind, every stage — 752 are residential projects still under way. This list keeps only those, and looks further out.
42 projects within 1 km — showing the nearest 6.
300 m awayMixed
VIBRANCE
SAHAKAR BUILDERS & DEVELOPERS · Hariyali · Kurla
4 yr 7 mo
May 2026registered
Dec 2030target completion
Government Guidance Rate₹58,596/sq ydScale59 flatsAuthorityMahaRERA