Builder's track record — done
03
Location
MahaRERA · Registration filing
District
Mumbai City
Pincode
400036
Survey no.
Cadastral Survey No 579
North boundary
CTS No 578 Ashiyana Bldg
East boundary
CTS No 438 Godrej Baug
South boundary
CTS No 580 Gamadia House
West boundary
Nepeansea Road
What’s nearby
SchoolsNearest school 1.2km away · College or university 1.6km away
HealthcareHospital 381m away · 9 clinics within 1km · Doctor's clinic within 1km
LifestylePark 942m away · Playground within 500m · Gym or sports centre 191m away
Expressway 3.3 km · A Patil FlyoverPrimary road 529 m · Hughes Road (N Saptkar Marg)Railway line 1.3 km · WesternRailway(Fast)Railway station 1.4km away (Grant Road)8 bus stops within 500m
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Mumbai Municipal Corporation
Municipal Corporation
Building Permit
Survey no. Cadastral Survey No 579
The promised possession date (30 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts — about 1 in 2 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
2 complaints · 1 disposed · 0 open · 1 with no clear status
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12500952
18 Mar 2025
not stated
CC006000000079408
28 May 2019
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,154 residential projects still under way within 25 km. Step out ring by ring:
Of the 571 projects the radar draws within 6 km — every kind, every stage — 195 are residential projects still under way. This list keeps only those, and looks further out.