HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

36 BABULNATH

P51900015000 · MahaRERA · https://gethorizon.in/projects/36-babulnath-babulnath-ward-abcd-j2e93brf

01

Complete project overview

MahaRERA · Registration filing
Project name
36 BABULNATH
Units
12 units
Mix
7 × 3 BHK · 4 × 1 RK · 1 × 2 BHK
Carpet area
13–119 sq mper-unit range, as filed
Floors
21
Parking
30 spaces
Land area
534 sq m
Sanctioned built-up
1,880 sq m

Timeline

RERA registeredJan 2018
Proposed completionSep 2021
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

12 units across 5 batches
TypeArea sq mCount
3 BHK1191
1 RK134
2 BHK801
3 BHK1043
3 BHK1073

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

VINOD MOHANLAL JAIN

IndividualPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2018–2021Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 47 new projects last year
  • 550 nearby projects
1 km radius · coordinates as filed · 18.9574, 72.8074 · © OpenStreetMap contributors
Taluka
Ward ABCD
District
Mumbai City
Pincode
400007
Survey no.
PLOT NO. 36 A , CS NO. 10/380
North boundary
40 FEET ROAD
East boundary
30 FEET ROAD
South boundary
PLOT NO 35
West boundary
15 FEET SERVICE PASSAGE
What’s nearby
Schools1 school within 1km · College or university 1.3km away
HealthcareHospital 31m away · 12 clinics within 1km · Pharmacy within 1km
LifestylePark 1.3km away · Gym or sports centre 767m away · 32+ restaurants and cafes within 1km
ShoppingSupermarket 1.7km away · Mall 1.3km away · Bank 296m away
Getting around
Expressway 3.0 km · A Patil FlyoverPrimary road 139 m · Babulnath MargRailway line 755 m · Western Railway (Slow)Railway station 1.1km away (Grant Road)2 bus stops within 500m
Water & environment
River 550 m · ganga
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~20 m of the recorded location in 2016 (about 12 m), 30 m in 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

07

Other projects nearby

The register · within 25 km

2,139 residential projects still under way within 25 km. Step out ring by ring:

Of the 550 projects the radar draws within 6 km — every kind, every stage — 191 are residential projects still under way. This list keeps only those, and looks further out.

13 projects within 1 km — showing the nearest 6.

20 m awayResidential / Group Housing

The Manor

Taksheel Reaalty LLP · D-400007 · Ward ABCD

Aug 2024registered
Dec 2027target completion
Scale24 flatsAuthorityMahaRERA
210 m awayMixed

DHULEVA ONE50

THE NEW ERA AGENCIES PVT LTD · Mumbai City

Mar 2026registered
Dec 2033target completion
Scale48 flatsAuthorityMahaRERA
210 m awayResidential / Group Housing

Kinjal Legacy

Hi Rock Construction Private Limited · Malabar Hill · Ward ABCD

Jul 2026registered
Jun 2029target completion
Government Guidance Rate₹2,81,658/sq ydScale2 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

Central Park

H. M. Holdings · Mumbai City

Sep 2022registered
Jul 2026target completion
Scale4 flatsAuthorityMahaRERA
500 m awayResidential / Group Housing

Central Park

H. M. Holdings · Mumbai City

Oct 2023registered
Jul 2028target completion
Scale42 flatsAuthorityMahaRERA
540 m awayResidential / Group Housing

30 LITTLE GIBBS

SILA MALABAR HILL REAL ESTATE LLP · MALABAR

Oct 2023registered
Jun 2029target completion
Scale31 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Complaints & litigation
    • Court cases, as declared by the builder, in its MahaRERA filing.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/36-babulnath-babulnath-ward-abcd-j2e93brf.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.