Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
28 units across 1 batch
TypeArea sq mCount
4 BHK29428
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
District
Mumbai City
Pincode
400026
Survey no.
4-733 part, Malabar-Camballa Hill Division, Carmichael Road Mumbai
North boundary
733
East boundary
733
South boundary
10-722 and 13-722
West boundary
Setback of Carmichael Road
What’s nearby
Schools2 schools within 500m · 12 educational institutions within 1km · College or university 296m away
HealthcareHospital 432m away · 10 clinics within 1km · Doctor's clinic within 1km
Lifestyle1 park within 500m · Gym or sports centre 681m away · 24+ restaurants and cafes within 1km
Expressway 2.2 km · A Patil FlyoverPrimary road 177 m · Gopalrao Deshmukh MargRailway line 785 mRailway station 868m away (Mumbai Central)Bus stop within 500m
Water & environment
Water body 744 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12504032
15 Nov 2025
Order Approveddisposed
Court cases, as declared
Declared by the builder
2 cases
Number
Forum
Date
009044/ 2019
Supreme Court of India
2019
PIL/48/2016
High Court of Bombay
2016
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
2,326 residential projects still under way within 25 km. Step out ring by ring:
Of the 693 projects the radar draws within 6 km — every kind, every stage — 239 are residential projects still under way. This list keeps only those, and looks further out.
19 projects within 1 km — showing the nearest 6.
90 m awayResidential / Group Housing
Godrej Carmichael
Godrej Properties Limited · Malabar Hill · Ward ABCD
5 yr 10 mo
Dec 2023registered
Oct 2029target completion
Government Guidance Rate₹5,97,187/sq ydScale13 flatsAuthorityMahaRERA