HORIZON
Share

Amarsons Entallia

P51900009079 · MahaRERA · https://gethorizon.in/projects/amarsons-entallia-mumbai-city-t8v4oeny

01

Complete project overview

MahaRERA · Registration filing
Units
19 units
Mix
11 × 1 BHK · 8 × 2 BHK
Carpet area
79–227 sq mper-unit range, as filed
Floors
24
Parking
1 spaces
Land area
1,391 sq m
Sanctioned built-up
5,582 sq m
Recreational open space
125 sq m

Timeline

RERA registeredAug 2017
Proposed completionMar 2020
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

19 units across 15 batches
TypeArea sq mCount
1 BHK971
1 BHK981
1 BHK1121
1 BHK941
1 BHK1121
1 BHK1401
1 BHK971
1 BHK1001
2 BHK2113
1 BHK2271
2 BHK2273
1 BHK791
2 BHK1381
1 BHK1121
2 BHK2111

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

D T CORPORATION

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2017–2020Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400026
Survey no.
713 10 and 557 Plot No
North boundary
Partly by plot no 556 A and 556 B of Dadar Matunga
East boundary
By Sir Hormusji Adenwala Road
South boundary
By Plot No 558 of Dadar Matunga
West boundary
By Plot No 574 of Dadar Matunga
What’s nearby
Schools1 school within 500m · 8 educational institutions within 1km · College or university 462m away
HealthcareHospital 581m away · 10 clinics within 1km · Doctor's clinic within 1km
Lifestyle1 park within 500m · Gym or sports centre 600m away · 22+ restaurants and cafes within 1km
ShoppingSupermarket 641m away · Mall 308m away · Bank 283m away
Getting around
Expressway 2.4 km · A Patil FlyoverPrimary road 3 m · Gopalrao Deshmukh MargRailway line 959 mRailway station 1.0km away (Mumbai Central)Bus stop within 500m
Water & environment
River 765 m · ganga
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

2,312 residential projects still under way within 25 km. Step out ring by ring:

Of the 678 projects the radar draws within 6 km — every kind, every stage — 232 are residential projects still under way. This list keeps only those, and looks further out.

16 projects within 1 km — showing the nearest 6.

210 m awayResidential / Group Housing

Kalpataru Prive

Kalpataru Hills Residency Private Limited · Malabar Hill

Oct 2022registered
Oct 2027target completion
Scale17 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

Echjay House

E House Realty Private Limited · Mumbai City

Feb 2025registered
Jun 2030target completion
Scale13 flatsAuthorityMahaRERA
240 m awayResidential / Group Housing

Godrej Carmichael

Godrej Properties Limited · Malabar Hill · Ward ABCD

Dec 2023registered
Oct 2029target completion
Government Guidance Rate₹5,97,187/sq ydScale13 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

Imperial T3 Wing C

S. D. Corporation Private Limited · Malabar Hill · Ward ABCD

Feb 2026registered
Mar 2033target completion
Scale215 flatsAuthorityMahaRERA
360 m awayResidential / Group Housing

Imperial T3 Wing C1

S D CORPORATION PRIVATE LIMITED · Malabar Hill · Mumbai City

Jul 2026registered
Jul 2034target completion
Scale212 flatsAuthorityMahaRERA
530 m awayMixed

AYUDDHA EVED

CRYSTAL PROGRESSIVE LLP · Mumbai City

Apr 2026registered
Dec 2030target completion
Scale79 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.