HORIZON
Share

SHITAL CHAYA

BRERAP45613-1/109/R-1241/2021 · RERA Bihar · https://gethorizon.in/projects/shital-chaya-danapur-patna-iw9bfue8

01

Complete project overview

RERA Bihar · Registration filing
Project name
SHITAL CHAYA
Units
20 units
Unit mix
12 × 2 BHK · 8 × 3 BHK
Parking
20 spaces
Land area
2,207 sq m
Built-up area
1,785 sq m

Timeline

Project startedAug 2021
RERA registeredNov 2021
Proposed completionNov 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

20 units across 2 batches
BuildingTypeArea sq mCount
SHITAL CHAYA3 BHK08
SHITAL CHAYA2 BHK012

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

DIKSHA BUILDCON PRIVATE LIMITED

CompanyPromoter type
Ranchi, BiharBased in
---Select---Also RERA-registered in
1Projects
1City
2021–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
PATNA
Anchal (block)
Danapur
Mauja (revenue village)
Saguna
Address
NEAR SUZUKI SHOW ROOM, NAYA TOLA,SAGUNA MORE, DANAPUR, PATNA
What’s nearby
SchoolsNearest school 1.6km away · Library 828m away
HealthcareHospital 451m away · 2 clinics within 1km · Pharmacy within 1km
Lifestyle1 park within 500m · Gym or sports centre 685m away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 645m away · Mall 971m away · Bank 893m away
Getting around
Expressway 401 mPrimary road 1.5 kmRailway line 2.2 kmRailway station 2.3km away (Patliputra)Limited bus connectivity nearby
Water & environment
River 1.2 kmWater body 1.4 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹6.10 Cr declared to build 20 flats. What that works out to:

₹30.50 Lakhdeclared cost per flatall-in — land + construction
₹3,174/sq ftof built-up area₹34,165/sq m
59%of the cost is land₹1,515/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹18,595per sq yd
₹22,239per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Saguna Naya Tola”.
Highest rate
₹21,178 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹22,239 / sq m₹18,595 / sq yd
Res. Main Road₹25,328 / sq m₹21,177 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (25 Nov 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

360 residential projects still under way within 25 km. Step out ring by ring:

Of the 751 projects the radar draws within 6 km — every kind, every stage — 219 are residential projects still under way. This list keeps only those, and looks further out.

18 projects within 1 km — showing the nearest 6.

DanapurResidential/Group Housing

AJAY CITY

Sai Sampann Infra LLP

Mar 2025registered
Aug 2028target completion
Declared cost₹31.10 CrScale170 flatsAuthorityRERA Bihar
SIKANDARPURResidential/Group Housing

WINSOME ELITE

SANJEEV KUMAR

Mar 2025registered
Mar 2029target completion
Declared cost₹53.00 CrScale145 flatsAuthorityRERA Bihar
DanapurMixed Development(residential and commercial)

Ghar Apna Block A, B, C and D

Nissaa Realtors Private Limited

May 2023registered
Jan 2027target completion
Declared cost₹30.75 CrScale117 flatsAuthorityRERA Bihar
DanapurResidential/Group Housing

MALTI RAJENDRA ENCLAVE

NUTAN BUILDCON PRIVATE LIMITED

Aug 2022registered
Jul 2027target completion
Declared cost₹2.11 CrScale9 flatsAuthorityRERA Bihar
DanapurResidential/Group Housing

PIYUSH KUTIR

Kutir Housing Developers & Consultants Pvt. Ltd.

May 2026registered
Mar 2030target completion
Declared cost₹4.01 CrScale24 flatsAuthorityRERA Bihar
DanapurResidential/Group Housing

SUNRISE

URBAN REALTY HOMES

May 2023registered
Jan 2028target completion
Declared cost₹3.68 CrScale20 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.