Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
14 units across 4 batches
BuildingTypeArea sq mCount
REETANJAN3 BHK04
REETANJAN4 BHK04
REETANJANOffice02
REETANJANShop04
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Bihar · Registration filing
District
Patna
City / town
PATNA
Anchal (block)
Danapur
Mauja (revenue village)
Jalalpur
Address
RAJDHANI NAGAR, GOLA ROAD, PATNA
What’s nearby
SchoolsNearest school 1.6km away · Library 411m away
HealthcareHospital 223m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 1.5km away · Gym or sports centre 269m away · 18+ restaurants and cafes within 1km
Expressway 1.0 kmPrimary road 1.7 kmRailway line 1.2 kmRailway station 1.3km away (Patliputra)Limited bus connectivity nearby
Water & environment
River 1.9 kmCanal 2.0 km · Barun Canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹12.50 Cr declared to build 14 flats. What that works out to:
₹89.27 Lakhdeclared cost per flatall-in — land + construction
₹2,837/sq ftof built-up area₹30,532/sq m
37%of the cost is land₹2,593/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Bihar Registration — Minimum Value Register
In Bihar it’s called the MVR (minimum value register) rate.
₹17,562per sq yd
₹21,004per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Jalalpur Rajdhani Nagar”.
Highest rate
₹21,178 per sq yd — the top road-facing rate among the residential rates published for this village
By the road it faces
Res. Branch Road
₹21,004 / sq m
₹17,562 / sq yd
Res. Main Road
₹25,328 / sq m
₹21,177 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
What this number is — and isn’t
The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Bihar · Approved building plan
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Bihar · public record
Complaints register
Not published. RERA Bihar doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Bihar
Litigation
None declared in this filing
Only what the builder declared, or what RERA Bihar records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Bihar, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
359 residential projects still under way within 25 km. Step out ring by ring:
Of the 811 projects the radar draws within 6 km — every kind, every stage — 224 are residential projects still under way. This list keeps only those, and looks further out.