HORIZON
Share

Shiv Imperia

PR/GJ/ANAND/ANAND/Others/RAA09348/201121 · GujRERA · https://gethorizon.in/projects/shiv-imperia-anand-kz17yhnk

01

Complete project overview

GujRERA · Registration filing
Units
8 units
Mix
8 × Residential
Carpet area
228–286 sq mper-unit range, as filed
Blocks
5
Parking
8 spaces
Land area
4,047 sq m

Timeline

Project startedJun 2021
RERA registeredNov 2021
Proposed completionDec 2025
TodaySep 2026
Construction progress

73% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

8 units across 1 batch
TypeArea sq mCount
Residential2708

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

Amitkumar Prakashbhai Patel Proprietor of Shiv Developers

Individual/PropritorshipPromoter type
Anand, GujaratBased in
1Projects
1City
2021–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Anand
District
Anand
Address
Shiv Residency, Bakrol-Anand Road
What’s nearby
SchoolsNo schools within 2km · College or university 1.9km away
HealthcareHospital 1.1km away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 1.2km away · Mall 917m away
Getting around
Expressway 3.3 kmPrimary road 40 mRailway line 2.4 kmRailway station 2.5km away (Vallabh Vidynagar)Limited bus connectivity nearby
Water & environment
Canal 1.0 kmWater body 2.1 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹8.57 Cr declared to build 8 flats. What that works out to:

₹1.24 Cr – ₹2.00 Crdeclared unit pricerange on the filing — not a live asking price
₹1.07 Crdeclared cost per flatall-in — land + construction
₹3,690/sq ftof carpet area₹39,723/sq m
39%of the cost is land₹773/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

₹10,034per sq yd
₹12,000per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “BAKROL”.
In force
2011 schedule

This filing declares ₹39,723 per sq m of carpet area — 3.31× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.

What this number is — and isn’t

  • The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

GujRERA · Approved building plan

Others

Building Permitapproved 20 Nov 2021 · 4 yrs ago

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

Building-Use (BU) permission — the occupancy sign-off, on record

All 5 blocks carry a Building-Use (BU) permission (latest 24 Dec 2025)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

The approving authority

The body that approved this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

111 residential projects still under way within 25 km. Step out ring by ring:

Of the 276 projects the radar draws within 6 km — every kind, every stage — 79 are residential projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

570 m awayResidential/Group Housing

Keshvam Bunglows

KESHVAM REALTY · Anand

Dec 2021registered
Sep 2026target completion
Declared cost₹10.23 CrScale56 flatsAuthorityGujRERA
590 m awayResidential/Group Housing

NANDDHAM BUNGALOWS

JETHABHAI KAMABHAI PRAJAPATI · Anand

Apr 2022registered
Dec 2027target completion
Declared cost₹3.72 CrScale18 flatsAuthorityGujRERA
840 m awayResidential/Group Housing

Sanjivan Nirvana

SANJIVAN DEVELOPERS · Anand

Mar 2026registered
Oct 2029target completion
Price band₹58.50 Lakh–₹1.08 CrScale47 flatsAuthorityGujRERA
900 m awayResidential/Group Housing

Ved Ambica

VISHALKUMAR PATEL AND OTHERS · Anand

Jan 2022registered
Sep 2026target completion
Declared cost₹5.03 CrScale40 flatsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.