SIGNATURE CITY PHASE- II

BRERAP00298-2/29/R-1326/2022 · RERA Bihar · https://gethorizon.in/projects/signature-city-phase-ii-vajayichapra-muzaffarpur-gu6fe8du

01

Complete project overview

RERA Bihar · Registration filing
Project name
SIGNATURE CITY PHASE- II
Units
26 units
Unit mix
26 × Duplex
Buildings
4
Land area
3,120 sq m
Built-up area
2,872 sq m

Timeline

Project startedFeb 2021
RERA registeredMar 2022
Proposed completionFeb 2025
TodaySep 2026

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

26 units across 4 batches
BuildingTypeArea sq mCount
SIGNATURE CITY,PHASE-II (ASHIYANA))Duplex02
SIGNATURE CITY,PHASE-II(AANCHAL)Duplex013
SIGNATURE CITY,PHASE-II(ASHIYANA)Duplex4978
SIGNATURE CITY,PHASE-II(MANNAT)Duplex03

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

MILESTONE HOMES INFRATECH PVT.LTD.

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
2Projects
2Cities
2019–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
38 homeson the public record across 2 projects
4,091 sq mbuilt-up filed
4,415 sq mland declared
₹7.98 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MILESTONE HOMES INFRATECH PVT.LTD.— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Muzaffarpur
City / town
MUZAFFARPUR
Anchal (block)
Kanti
Mauja (revenue village)
Dadara Kolhua
Village
VAJAYICHAPRA
Address
VIJAYICHAPRA, PAIGAMBARPUR KOLHUA, MUZAFFARPUR
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.4km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 557 m · East-West CorridorPrimary road 1.4 kmRailway line 984 mRailway station 2.6km away (Kaparpura)Limited bus connectivity nearby
Water & environment
Water body 1.1 kmRiver 2.2 km · Burhi Gandak
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.62 Cr declared to build 26 flats. What that works out to:

₹21.62 Lakhdeclared cost per flatall-in — land + construction
₹1,818/sq ftof built-up area₹19,569/sq m
27%of the cost is land₹459/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹4,132per sq yd
₹4,942per sq m
Which rate
residential
Matched to
The rate published for the village of “Dadar Kolhua”.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (11 Feb 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

30 residential projects still under way within 25 km. Step out ring by ring:

Of the 55 projects the radar draws within 6 km — every kind, every stage — 14 are residential projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

340 m awayResidential/Group Housing

ADITYA RESIDENCY

NIVAS DHAM DEVELOPERS PRIVATE LIMITED · Marwan · MUZAFFARPUR

Mar 2023registered
Jul 2027target completion
Declared cost₹2.23 CrScale11 flatsAuthorityRERA Bihar
390 m awayResidential/Group Housing

DR RAM PRASAD ESTATE

ASHA VIHAR PROPERTIES PRIVATE LIMITED · KOLHUA · MUZAFFARPUR

Jan 2020registered
Oct 2027target completion
Declared cost₹157.37 CrScale647 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.