HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

The Address by GS Tower 4

PR1170002501879 · MahaRERA · https://gethorizon.in/projects/the-address-by-gs-tower-4-salt-pan-division-ward-fnorth-xkxe1h47

01

Complete project overview

MahaRERA · Registration filing
Project name
The Address by GS Tower 4
Units
217 units
Floors
34
Buildings
2
Parking
302 spaces
Land area
32,022 sq m
Sanctioned built-up
20,118 sq m
Recreational open space
3,101 sq m

Timeline

RERA registeredDec 2025
Proposed completionMar 2031
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Community Building…0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

TEN X Realty East Limited, Messrs Renaissance Spaces

CompanyPromoter type
Thane, MAHARASHTRABased in
4Projects
1City
2025–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
854 homeson the public record across 4 projects
77,212 sq mbuilt-up filed
1,28,089 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from TEN X Realty East Limited, Messrs Renaissance Spaces— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 255 new projects last year
  • 2,173 nearby projects
1 km radius · coordinates as filed · 19.0409, 72.8720 · © OpenStreetMap contributors
Village
Salt Pan Division
Taluka
Ward FNorth
District
Mumbai City
Pincode
400022
Survey no.
4(part) and 7(part)
North boundary
By CS No. 4(pt) & 7(pt)
East boundary
By CS No. 4(pt), 6(pt) & 7(pt)
South boundary
18.30m wide DP Road & CS No. 7(pt)
West boundary
By 18.30m wide DP Road
What’s nearby
SchoolsNearest school 1.8km away · College or university 737m away · Library 758m away
HealthcareHospital 822m away · Clinic within 2km
LifestyleNo parks within 2km · 5 restaurants and cafes within 1km
ShoppingSupermarket 1.9km away · Mall 865m away · ATM within 500m
Getting around
Expressway 874 m · Sion FlyoverPrimary road 833 m · Sion CircleRailway line 461 m · Central Railway (Harbour Line)Railway station 311m away (Wadala Depot)3 bus stops within 500m
Water & environment
Water body 773 m
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

The yearly satellite view ends in 2023 and this project started in 2025, so it does not cover this project's construction: the site was still open ground within ~80 m of the recorded location when the series ends. The 2026 image shows the site more recently.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~80 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • This series ends in 2023, before this project’s construction — so it shows what stood here before, and says nothing about whether building has since begun. The photograph does that.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~80 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • The yearly site view ends in 2023, before this project started in 2025.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹95,260per sq yd
₹1,13,930per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Salt Pan Division”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
06

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 4(part) and 7(part)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

08

Other projects nearby

The register · within 25 km

3,912 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,173 projects the radar draws within 6 km — every kind, every stage — 743 are residential projects still under way. This list keeps only those, and looks further out.

15 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

The Address by GS Tower 1

TEN X Realty East Limited , Messrs Renaissance Spaces · Salt Pan Division · Ward FNorth

Dec 2025registered
Aug 2031target completion
Government Guidance Rate₹95,260/sq ydScale168 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

The Address by GS Tower 2

TEN X Realty East Limited , Messrs Renaissance Spaces · Salt Pan Division · Ward FNorth

Dec 2025registered
Mar 2031target completion
Government Guidance Rate₹95,260/sq ydScale236 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

The Address by GS Tower 3

TEN X Realty East Limited , Messrs Renaissance Spaces · Salt Pan Division · Ward FNorth

Dec 2025registered
Mar 2031target completion
Government Guidance Rate₹95,260/sq ydScale233 flatsAuthorityMahaRERA
290 m awayResidential / Group Housing

Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH -V, Mumbai

Maharashtra Housing and Area Development Authority · sion · Ward FNorth

Apr 2026registered
Dec 2030target completion
Scale352 flatsAuthorityMahaRERA
350 m awayResidential / Group Housing

DM Shree Siddha Sadan

DM BUILDCON LLP · Sion-Matunga-West · Mumbai City

May 2026registered
Dec 2029target completion
Scale23 flatsAuthorityMahaRERA
420 m awayResidential / Group Housing

RUNWAL TIMELESS

RUNWAL DEVELOPERS LIMITED · Sion East

Aug 2017registered
Sep 2026target completion
7 open complaintsScale749 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • Court cases, as declared by the builder, in its MahaRERA filing.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/the-address-by-gs-tower-4-salt-pan-division-ward-fnorth-xkxe1h47.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.