01

Complete project overview

MahaRERA · Registration filing
Units
130 units
Floors
24
Buildings
7
Parking
108 spaces
Land area
2,163 sq m
Sanctioned built-up
13,434 sq m

Timeline

RERA registeredOct 2018
Proposed completionJun 2026
TodaySep 2026
Construction progress
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Open Parking0%
OC-readiness90%
Excavation100%
Basement (if any)100%
Podiums100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Siddheshwar Construction Co.

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2018–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400022
Survey no.
CTS No.576, 5761 to 15, 578, 5781 to 11, 579, 5791 to 15 and 580
North boundary
CTS No 579
East boundary
13 Meter Road
South boundary
Siddheshwar Residency-CTS No 581
West boundary
Samarth Nagar
What’s nearby
SchoolsNearest school 1.8km away · College or university 712m away · Library 671m away
HealthcareHospital 280m away · 1 clinic within 1km
LifestylePark 1.0km away · Gym or sports centre 1.9km away · 6 restaurants and cafes within 1km
ShoppingSupermarket 2.0km away · Mall 1.8km away
Getting around
Expressway 282 mPrimary road 354 m · Lal Bahadur Shastri MargRailway line 165 m · Central Railway (Harbour Line)Railway station 157m away (Chuna Bhatti)7 bus stops within 500m
Water & environment
Water body 556 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. CTS No.576, 5761 to 15, 578, 5781 to 11, 579, 5791 to 15 and 580

The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,942 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,499 projects the radar draws within 6 km — every kind, every stage — 833 are residential projects still under way. This list keeps only those, and looks further out.

17 projects within 1 km — showing the nearest 6.

120 m awayResidential / Group Housing

Shivay Serenity

TKJ Enterprises Private Limited · Kurla

Jul 2026registered
Oct 2029target completion
Scale9 flatsAuthorityMahaRERA
150 m awayMixed

Landmark

Aahana Expert Homes · Kurla

Mar 2026registered
Dec 2032target completion
Scale58 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

RAHEJA AMALTIS - WING B

K RAHEJA CORP REAL ESTATE PRIVATE LIMITED · Sion West

Dec 2023registered
Sep 2028target completion
Scale66 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

RAHEJA AMALTIS - WING A

K RAHEJA CORP REAL ESTATE PRIVATE LIMITED · Sion West

Dec 2023registered
Sep 2028target completion
Scale63 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

DHANISHTHA

Ameya Realtors Private Limited · Kurla

Dec 2025registered
Dec 2030target completion
Scale38 flatsAuthorityMahaRERA
250 m awayResidential / Group Housing

The Address by GS Sion Tower A

Ten X Realty Limited · Sion east · Mumbai City

Mar 2026registered
Jul 2031target completion
Government Guidance Rate₹1,90,997/sq ydScale109 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.