The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kanheri
Taluka
Borivali
District
Mumbai Suburban
Pincode
400092
Survey no.
F.P. NO. 62,63 & 64
North boundary
JAIN MANDIR
East boundary
S V ROAD
South boundary
TEJMAL BUILDING
West boundary
INDRADARSHAN BUILDING
What’s nearby
Schools1 school within 1km · Library 530m away
HealthcareHospital 74m away · 19 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.2km away · Gym or sports centre 1.2km away · 9 restaurants and cafes within 1km
ShoppingSupermarket 862m away · Mall 170m away · Convenience store within 500m
Getting around
Expressway 901 m · Western Express HighwayPrimary road 102 m · Swami Vivekanand RoadRailway line 120 m · Western Railway Virar to BorivaliRailway station 447m away (Borivali)9 bus stops within 500m
Water & environment
Water body 527 m · Veer Savarkar Udyan Pond
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹1,12,417per sq yd
₹1,34,450per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Kanheri”.
In force
2026-2027 schedule
Spread
₹95,711 – ₹1,65,829 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. F.P. NO. 62,63 & 64
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12401286
30 Dec 2024
Order Approveddisposed
Appeals to the Appellate Tribunal
MahaRERA's own register
1 appeal · 0 disposed · 1 open
Number
Date
Status
AT06/00910/2025from complaint CC12401286
7 Sep 2025
Appeal Submittedopen
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
225 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,936 projects the radar draws within 6 km — every kind, every stage — 35 are commercial projects still under way. This list keeps only those, and looks further out.