HORIZON
Share

6, Boulevard

PR1261012600142 · MahaRERA · https://gethorizon.in/projects/6-boulevard-tathwade-mulshi-4w2kl65b

01

Complete project overview

MahaRERA · Registration filing
Project name
6, Boulevard
Units
214 units
Floors
33
Buildings
4
Parking
425 spaces
Land area
20,200 sq m
Sanctioned built-up
27,637 sq m
Recreational open space
1,968 sq m

Timeline

RERA registeredApr 2026
Proposed completionDec 2030
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Community Building…0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

SMP Namrata Lotus Landmarks LLP

Limited Liability PartnershipPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Tathwade
Taluka
Mulshi
District
Pune
Pincode
411033
Survey no.
Survey No-168 Hissa No. 3
North boundary
6.00M Wide Fire Driveway
East boundary
Tower EWS
South boundary
6.00M Wide Fire Driveway
West boundary
Tower D
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.8km away
HealthcareHospital 1.2km away · 1 clinic within 1km
LifestylePark 1.2km away · 3 restaurants and cafes within 1km
ShoppingSupermarket 1.3km away
Getting around
Expressway 645 mPrimary road 356 m · Aundh Ravet RoadRailway line 2.5 km · Mumbai–Pune RailwayRailway station 2.5km away (Akurdi Railway Station)Limited bus connectivity nearby
Water & environment
River 618 m · Pavana RiverWater body 927 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹58,805per sq yd
₹70,330per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Tathwade”.
In force
2026-2027 schedule
Spread
₹38,537₹71,715 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Pimpri Chinchwad Municipal Corporation

Municipal Corporation
Building Permit
Survey no. Survey No-168 Hissa No. 3
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Pimpri Chinchwad Municipal Corporation

Municipal corporation

Has approved 1,391 RERA projectsabout 1 in 14 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,044 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,698 projects the radar draws within 6 km — every kind, every stage — 550 are residential projects still under way. This list keeps only those, and looks further out.

41 projects within 1 km — showing the nearest 6.

220 m awayResidential / Group Housing

AVENTIS

DEVSIA INFRACON LLP · Tathwade · Mulshi

May 2025registered
Jun 2030target completion
Government Guidance Rate₹58,805/sq ydScale199 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

Aventis - Tower C & D

DEVSIA INFRACON LLP · Tathwade · Mulshi

Jun 2026registered
May 2031target completion
Government Guidance Rate₹58,805/sq ydScale134 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

Aventis - Tower A

DEVSIA INFRACON LLP · Tathwade · Mulshi

Jun 2026registered
May 2031target completion
Government Guidance Rate₹58,805/sq ydScale155 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

Akshara Harmony

Garve Developers and Promoters · Wakad · Mulshi

Aug 2023registered
Mar 2026target completion
Government Guidance Rate₹68,746/sq ydScale16 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

Akshara Serenity B and C

Garve Developers and Promoters · Tathwade · Mulshi

Jun 2023registered
May 2026target completion
Government Guidance Rate₹58,805/sq ydScale52 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

Akshara Meadows

Garve Developers and Promoters · Tathwade · Mulshi

Mar 2024registered
Dec 2026target completion
Government Guidance Rate₹58,805/sq ydScale11 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.