HORIZON
Share

AL HADI RESIDENTIAL COMPLEX PHASE II

P51700027345 · MahaRERA · https://gethorizon.in/projects/al-hadi-residential-complex-phase-ii-thane-m-corp-n2g2b35p

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
AL HADI RESIDENTIAL COMPLEX PHASE II
Units
84 units
Mix
42 × 2 BHK · 42 × 1 BHK
Carpet area
32–54 sq mper-unit range, as filed
Floors
9
Buildings
3
Parking
46 spaces
Land area
2,601 sq m
Sanctioned built-up
2,577 sq m
Recreational open space
612 sq m

Timeline

RERA registeredDec 2020
Proposed completionSep 2025
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

84 units across 6 batches
TypeArea sq mCount
2 BHK5214
2 BHK5414
1 BHK3228
1 BHK3514
2 BHK527
2 BHK547

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

SAHYADRI GRIH NIRMAN

PartnershipPromoter type
Thane, MAHARASHTRABased in
4Projects
1City
2017–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
300 homeson the public record across 4 projects
10,219 sq mbuilt-up filed
11,854 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from SAHYADRI GRIH NIRMAN— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Thane (M Corp.)
Taluka
Thane
District
Thane
Pincode
400612
Survey no.
47/1A
North boundary
FATIMA ENCLAVE
East boundary
SURVEY NO 54
South boundary
FALAH COMPLEX
West boundary
GALAXY COMPLEX
What’s nearby
Schools1 school within 1km
HealthcareHospital 1.1km away · Clinic within 2km
LifestylePark 1.8km away · 5 restaurants and cafes within 1km
ShoppingNo supermarket within 2km · Convenience store within 1km · ATM within 500m
Getting around
Expressway 1.5 km · Mumbra-Kausa BypassPrimary road 471 m · Thane Belapur RoadRailway line 523 m · Trans-Harbour LineRailway station 2.9km away (Kalva)2 bus stops within 500m
Water & environment
Water body 990 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Thane (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923₹1,55,185 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

5,495 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,382 projects the radar draws within 6 km — every kind, every stage — 498 are residential projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

970 m awayOthers

ONE PYRAMID

PACIFIC PROPERTIES · Navi Mumbai · Thane

Mar 2023registered
Dec 2026target completion
Scale81 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.