NEWA BHAKTI KNOWLEDGE CITY COMMERCIAL BUILDING PHASE 1
Units
37 units
Mix
37 × Unit
Carpet area
189–1597 sq mper-unit range, as filed
Floors
5
Parking
12 spaces
Land area
9,338 sq m
Sanctioned built-up
13,634 sq m
Timeline
RERA registeredAug 2017
Proposed completionSep 2021
TodaySep 2026
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
37 units across 17 batches
TypeArea sq mCount
Unit2451
Unit3751
Unit2284
Unit2531
Unit3661
Unit3492
Unit2194
Unit3572
Unit1893
Unit1,2732
Unit3761
Unit3592
Unit2284
Unit1983
Unit2541
Unit1973
Unit1,5972
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.9km away · Library 1.4km away
HealthcareHospital 1.4km away · Clinic within 2km
LifestylePark 1.3km away · Gym or sports centre 2.0km away
ShoppingNo supermarket within 2km · Bank 504m away
Getting around
Expressway 2.2 km · Eastern Express HighwayPrimary road 976 m · Thane Belapur RoadRailway line 695 m · Trans-Harbour LineRailway station 2.1km away (Thane)Bus stop within 500m
Water & environment
Water body 479 m
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~54 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~54 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~54 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
287 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,598 projects the radar draws within 6 km — every kind, every stage — 56 are commercial projects still under way. This list keeps only those, and looks further out.
1 project within 1 km — showing the nearest 1.
990 m awayCommercial
NIFT City - BKC II Building A
DELTA VENUS INFRA LLP · Kalwa · Thane
5 yr 9 mo
Mar 2026registered
Dec 2031target completion
Government Guidance Rate₹72,743/sq ydScale1,062 flatsAuthorityMahaRERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Complaints & litigation
MahaRERA's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/newa-bhakti-knowledge-city-commercial-navi-mumbai-m-corp-thane-qqcp2h4a.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.