This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Baner
Taluka
Haveli
District
Pune
Pincode
411045
Survey no.
S NO 33 1 P
North boundary
PROPERTY OF BHAL CHANDRA NIKATE
East boundary
S NO 32 BY PART DP ROAD
South boundary
S NO 38 BY PART DP ROAD
West boundary
S NO 33 2 GERA REGENT PARK
What’s nearby
SchoolsNearest school 1.1km away · College or university 647m away · Library 1.2km away
HealthcareHospital 707m away · 1 clinic within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 762m away · 10+ restaurants and cafes within 1km
ShoppingSupermarket 1.0km away · Mall 1.8km away · Convenience store within 1km
Getting around
Expressway 571 m · Katraj - Dehu Road BypassPrimary road 887 m · Pashan-Sus RoadMetro station 1.1km away (Balewadi Phata)Limited bus connectivity nearby
Water & environment
Water body 996 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹76,606per sq yd
₹91,620per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Baner”.
In force
2026-2027 schedule
Spread
₹42,233 – ₹88,337 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Pimpri Chinchwad Municipal Corporation
Municipal Corporation
Building Permit
Survey no. S NO 33 1 P
The promised possession date (30 Apr 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pimpri Chinchwad Municipal Corporation
Municipal corporation
Has approved 1,391 RERA projects — about 1 in 14 in Maharashtra.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC005000000147194
10 Jun 2022
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
260 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,670 projects the radar draws within 6 km — every kind, every stage — 57 are commercial projects still under way. This list keeps only those, and looks further out.
1 project within 1 km — showing the nearest 1.
680 m awayCommercial
AVENUE CECILIA
M/S AVENUE HOUSING PVT LTD · Baner · Haveli
6 yr 5 mo
Jul 2024registered
Dec 2030target completion
Government Guidance Rate₹76,606/sq ydScale6 flatsAuthorityMahaRERA