HORIZON
Share

AMI ONE

PR1180002500345 · MahaRERA · https://gethorizon.in/projects/ami-one-eksar-borivali-e88vb4b3

01

Complete project overview

MahaRERA · Registration filing
Land area
458 sq m
Sanctioned built-up
458 sq m

Timeline

RERA registeredJul 2025
Proposed completionDec 2027
TodaySep 2026
Construction progress
Excavation0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

AMI WISEOWLZZ REALTY

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Eksar
Taluka
Borivali
District
Mumbai Suburban
Pincode
400103
Survey no.
1392, 1392/1 & 2
North boundary
Existing Road
East boundary
CTS No 1393
South boundary
CTS No 1392, 1392/1 & 2
West boundary
Existing Road
What’s nearby
Schools1 school within 1km · College or university 1.9km away · Library 1.0km away
HealthcareHospital 88m away · 10 clinics within 1km · Pharmacy within 500m
LifestylePark 1.0km away · Gym or sports centre 504m away · 12+ restaurants and cafes within 1km
ShoppingSupermarket 162m away · Mall 1.4km away · Bank 186m away
Getting around
Expressway 1.0 km · Western Express HighwayPrimary road 197 m · Devidas RoadRailway line 509 m · Western Railway Virar to BorivaliMetro station 1.1km away (Eksar)3 bus stops within 500m
Water & environment
River 459 m · Dahisar River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 1392, 1392/1 & 2
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,013 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,853 projects the radar draws within 6 km — every kind, every stage — 651 are residential projects still under way. This list keeps only those, and looks further out.

70 projects within 1 km — showing the nearest 6.

60 m awayResidential / Group Housing

REDEVELOPMENT OF SBI EMP NAVJEEVAN CHSL

PRANAV CONSTRUCTIONS LIMITED · Eksar · Borivali

Aug 2025registered
Jul 2028target completion
Government Guidance Rate₹1,46,882/sq ydScale34 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

21 JEWEL

RATANSINGH AND BROTHERS · Borivali

May 2024registered
Dec 2028target completion
AuthorityMahaRERA
230 m awayResidential / Group Housing

Gorai Samadhan Cooperative Housing Society Limited

Gorai Samadhan Cooperative Housing Society Limited · Borivali

Dec 2025registered
Jun 2027target completion
Scale44 flatsAuthorityMahaRERA
250 m awayResidential / Group Housing

Giriraj Mandir Premises Co operative Society Limited

AMAR ASSOCIATES · Eksar · Borivali

Apr 2026registered
Sep 2029target completion
Government Guidance Rate₹1,38,128/sq ydScale105 flatsAuthorityMahaRERA
320 m awayResidential / Group Housing

Varella Mansion

DEAN HOME LLP · Madpeshwar · Borivali

Dec 2023registered
Oct 2027target completion
Government Guidance Rate₹1,45,988/sq ydScale82 flatsAuthorityMahaRERA
330 m awayMixed

NEELDHARA CO-OPERATIVE HOUSING SOCIETY LIMITED

Konark Structural Engineers Private Limited · Madpeshwar · Borivali

Jul 2026registered
Mar 2031target completion
Government Guidance Rate₹1,45,988/sq ydScale99 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.