BROWNLEAF ALLURE
ABACUS INFRA · Vadodara
Broadway Pride
Timeline
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹22.23 Cr declared to build 449 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
What this number is — and isn’t
The promised possession date (30 Dec 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
All 1 block carry a Building-Use (BU) permission (latest 30 Dec 2020)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
Has approved 655 RERA projects — 3.8% of Gujarat.
an apartments market — 98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
2 complaints
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | What | Date |
|---|---|---|
| GJ/CMP/NCQR/Vadodara/211230/0524 | Non-compliance · quarterly report | 30 Dec 2021 |
| GJ/CMP/SM/Vadodara/190702/0225 | Suo-motu | 2 Jul 2019 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
81 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,154 projects the radar draws within 6 km — every kind, every stage — 44 are commercial projects still under way. This list keeps only those, and looks further out.
4 projects within 1 km — showing the nearest 4.
ABACUS INFRA · Vadodara
NILAMBER HOSPITALITY LLP · Vadodara
MAHALAXMI DEVELOPERS · Vadodara
SHREE SAHANA INFRA LLP · Vadodara
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you