India International Tower (A6) - upto 13th Floor
Rare Townships Private Limited · Kurla
Detroit Residency (A5) - 19th Floor
Timeline
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from Rare Townships Private Limited— the full portfolio →
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (30 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 2,862 RERA projects — about 1 in 7 in Maharashtra, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
3 complaints · 3 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
| Number | Date | Status | |
|---|---|---|---|
| CC12600238 | 13 Jan 2026 | Order Approveddisposed | |
| CC12502757 | 6 Aug 2025 | Order Approveddisposed | |
| CC006000000396230 | 17 Jun 2023 | Order Approveddisposed |
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
4,635 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,484 projects the radar draws within 6 km — every kind, every stage — 441 are residential projects still under way. This list keeps only those, and looks further out.
18 projects within 1 km — showing the nearest 6.
Rare Townships Private Limited · Kurla
Rare Townships Private Limited · Kurla
Amppletech Projects Private Limited · Chembur · Kurla
ARYAMAAN DEVELOPERS PRIVATE LIMITED · Ghatkopar · Kurla
Ghatkopar Neelkanth Kunj CHSL · Kurla
Pinal Realty LLP · Kirol · Kurla
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you