HORIZON
Share

Hubtown Sunmist A 6th to Above Floor

P51800001202 · MahaRERA · https://gethorizon.in/projects/hubtown-sunmist-a-6th-to-above-floor-andheri-fkg6qg5m

01

Complete project overview

MahaRERA · Registration filing
Project name
Hubtown Sunmist A 6th to Above Floor
Units
64 units
Mix
62 × 2 BHK · 1 × 4.5 BHK · 1 × 4 BHK
Carpet area
78–150 sq mper-unit range, as filed
Floors
15
Parking
123 spaces
Land area
1,149 sq m
Sanctioned built-up
6,301 sq m

Timeline

RERA registeredJul 2017
Proposed completionDec 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

64 units across 39 batches
TypeArea sq mCount
4.5 BHK1501
2 BHK835
2 BHK836
2 BHK781
2 BHK821
2 BHK951
2 BHK781
2 BHK823
2 BHK894
2 BHK881
2 BHK911
4 BHK1411
2 BHK1001
2 BHK821
2 BHK784
2 BHK1001
2 BHK871
2 BHK871
2 BHK901
2 BHK831
2 BHK901
2 BHK893
2 BHK851
2 BHK841
2 BHK941
2 BHK951
2 BHK923
2 BHK932
2 BHK941
2 BHK862
2 BHK851
2 BHK901
2 BHK902
2 BHK861
2 BHK902
2 BHK821
2 BHK811
2 BHK781
2 BHK911

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Hubtown Limited

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
19Projects
3Cities
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,673 homeson the public record across 19 projects
1,38,047 sq mbuilt-up filed
27,650 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Municipal Corporation of Greater MumbaiMunicipal Corporation5 of 7 projects
Pmc1 of 7 projects
Pune Municipal CorporationMunicipal Corporation1 of 7 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Hubtown Limited— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400069
Survey no.
CTS NO 426 428 TO 430
North boundary
CTS 427 8
East boundary
CTS 425 426
South boundary
CTS 427 2
West boundary
CTS 427 3
What’s nearby
Schools5 schools within 1km · 6 educational institutions within 1km · Library 1.5km away
HealthcareHospital 311m away · 22 clinics within 1km · Pharmacy within 500m
LifestylePark 796m away · Gym or sports centre 1.2km away · 30+ restaurants and cafes within 1km
ShoppingSupermarket 309m away · Convenience store within 500m · Bank 67m away
Getting around
Expressway 698 m · Andheri FlyoverPrimary road 67 m · G K Gokhale FlyoverRailway line 446 mMetro station 480m away (Gundavali)7 bus stops within 500m
Water & environment
Water body 1.1 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,791 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,360 projects the radar draws within 6 km — every kind, every stage — 815 are residential projects still under way. This list keeps only those, and looks further out.

52 projects within 1 km — showing the nearest 6.

90 m awayOthers

VAIDYA WEST WORLD - SERENITY

VAIDYA SPACES PRIVATE LIMITED · Gundavali · Andheri

Apr 2024registered
Aug 2027target completion
Government Guidance Rate₹1,28,488/sq ydScale44 flatsAuthorityMahaRERA
90 m awayOthers

VAIDYA WEST WORLD -ONE AEROPOLIS

VAIDYA SPACES PRIVATE LIMITED · Gundavali · Andheri

Jul 2024registered
Jun 2028target completion
Scale9 flatsAuthorityMahaRERA
210 m awayResidential / Group Housing

GURUKRUPA ALAKNANDA

GURUKRUPA REALCON INFRASTRUCTURE DEVELOPERS · Mumbai City

Nov 2023registered
Dec 2026target completion
Scale76 flatsAuthorityMahaRERA
270 m awayResidential / Group Housing

VAIDYA WEST WORLD - HARMONY

VAIDYA SPACES PRIVATE LIMITED · Gundavali · Andheri

Apr 2024registered
Jul 2027target completion
Government Guidance Rate₹1,28,488/sq ydScale35 flatsAuthorityMahaRERA
320 m awayOthers

SIMRAN ENCLAVE WING C AND D

7 FIREFLIES PRODUCTION LLP · Vileparle · Andheri

May 2025registered
Dec 2028target completion
Scale148 flatsAuthorityMahaRERA
350 m awayOthers

ATHARV AARADHYAM

Atharv Infra LLP · Andheri

Aug 2023registered
Apr 2028target completion
Scale230 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.