HORIZON
Share

Kyron

PC1180002600583 · MahaRERA · https://gethorizon.in/projects/kyron-gundavali-andheri-24xnqmbs

01

Complete project overview

MahaRERA · Registration filing
Units
6 units
Floors
4
Buildings
2
Parking
4 spaces
Land area
3,545 sq m
Sanctioned built-up
679 sq m

Timeline

RERA registeredJun 2026
Proposed completionDec 2028
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Zire Rushi Construction

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
2Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
79 homeson the public record across 2 projects
6,099 sq mbuilt-up filed
6,415 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Zire Rushi Construction— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Gundavali
Taluka
Andheri
District
Mumbai Suburban
Pincode
400069
Survey no.
328,329(PT)
North boundary
36.6 mtrs wide N.S. Phadke marg
East boundary
C.T.S No.s 323, 327, 343/8
South boundary
C.T.S Nos. 447/1 and 447/2
West boundary
By C.T.S Nos. 426 and 447
What’s nearby
Schools1 school within 500m · 5 educational institutions within 1km · College or university 1.9km away
HealthcareHospital 426m away · 17 clinics within 1km · Pharmacy within 500m
LifestylePark 878m away · Gym or sports centre 1.1km away · 28+ restaurants and cafes within 1km
ShoppingSupermarket 463m away · Convenience store within 500m · Bank 248m away
Getting around
Expressway 647 m · Andheri FlyoverPrimary road 145 m · G K Gokhale FlyoverRailway line 630 mMetro station 321m away (Gundavali)6 bus stops within 500m
Water & environment
Water body 1.2 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 328,329(PT)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

243 commercial projects still under way within 25 km. Step out ring by ring:

Of the 2,373 projects the radar draws within 6 km — every kind, every stage — 57 are commercial projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

320 m awayCommercial

Solaris 14th Floor

Hubtown Limited · Andheri

Feb 2021registered
Jun 2026target completion
Scale19 flatsAuthorityMahaRERA
540 m awayCommercial

SPLENDOR ESQUINA

SPLENDOR SRL PRIVATE LIMITED · Chakala · Andheri

Feb 2026registered
Aug 2030target completion
Government Guidance Rate₹1,44,424/sq ydScale131 flatsAuthorityMahaRERA
710 m awayCommercial

Commercial Project Andheri

Havemore Realty Private Limited · Andheri

Nov 2021registered
Jun 2026target completion
Scale34 flatsAuthorityMahaRERA
890 m awayCommercial

FORTUNE ELITE

SAFFRON SPACES LIMITED · Gundavali · Andheri

Jan 2026registered
Dec 2028target completion
Government Guidance Rate₹1,28,488/sq ydScale293 flatsAuthorityMahaRERA
970 m awayCommercial

WEST AVENUE

AMAR LIFESPACES LLP · Andheri

Nov 2024registered
Dec 2026target completion
Scale21 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.