1. As per Township Policy 2010, we have to mortgage 12.50 % plots with the Local Body, accordingly 05 Plots, Plot No.- 18,19,25,28 AND 43 Total Area 1630.02 sqr mtr. are kept mortgaged. These Plots will be released once development work is completed. 2. The Open Area includes Park Area 997.50 sq. mtrs., Public Utility 10.00 sq. mtrs., SOLID WASTE MANAGEMENT Area 50.00 sq. mtrs., Mobile Tower Area 10.00 sq. mtrs. and Road Area 4972.54 sq. mtrs.,and zdp 18 mt road 1164.72 totalling 7204.76 sq. mtrs. 3. Since this is a plotted development project, hence parking is not applicable. 4.Saleable area Includes Residential Plots area 11885.24 sq. mtrs, Commercial Plot Area 788.00 sq. mtrs and Informal Commercial Area 72.00 sq. mtrs totalling 12745.24 sq. mtrs.
Timeline
Construction startJun 2023
RERA registeredJul 2026
Proposed completionOct 2027
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
86 plots across 44 batches
TypeArea sq mCount
Plot1301
Plot7881
Plot99
Plot1141
Plot1581
Plot1521
Plot1071
Plot1051
Plot1041
Plot1031
Plot1021
Plot1001
Plot981
Plot1341
Plot1121
Plot1151
Plot1271
Plot1911
Plot1911
Plot7371
Plot6981
Plot6981
Plot961
Plot1951
Plot1162
Plot1311
Plot1398
Plot1632
Plot1251
Plot1494
Plot10215
Plot1211
Plot1423
Plot1201
Plot1431
Plot1284
Plot1181
Plot1661
Plot1424
Plot1591
Plot1171
Plot1151
Plot5521
Plot1431
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.7 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Canal 3.1 kmWater body 3.6 km · Nevta Lake
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹17.54 Cr declared to build 86 plots. What that works out to:
₹20.40 Lakhdeclared cost per plotall-in — land + construction
₹817/sq ftof plotted area₹8,792/sq m
26%of the cost is land₹214/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹753per sq yd
₹900per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “BHANKROTA”.
Highest rate
₹1,706 per sq yd — the top road-facing rate among the residential rates published for this village
By the road it faces
interior plot
₹900 / sq m
₹753 / sq yd
road-facing
₹1,700 / sq m
₹1,421 / sq yd
41–60 ft road
₹1,870 / sq m
₹1,564 / sq yd
61–99 ft road
₹1,960 / sq m
₹1,639 / sq yd
100 ft+ road
₹2,040 / sq m
₹1,706 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
This filing declares ₹8,792 per sq m of plotted area — 9.77× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Urban Development Authority
Layout Permitapproved 9 Jun 2023 · 3 yrs ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
231 plotted projects still under way within 25 km. Step out ring by ring:
Of the 324 projects the radar draws within 6 km — every kind, every stage — 42 are plotted projects still under way. This list keeps only those, and looks further out.