Kuber Residency

BRERAP0004356-1/1185/R-948/2020 · RERA Bihar · https://gethorizon.in/projects/kuber-residency-danapur-patna-8830c4ix

01

Complete project overview

RERA Bihar · Registration filing
Project name
Kuber Residency
Units
52 units
Unit mix
42 × 3 BHK · 10 × 2 BHK
Parking
52 spaces
Land area
2,252 sq m
Built-up area
5,630 sq m

Timeline

Project startedFeb 2020
RERA registeredMay 2020
Proposed completionJun 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

52 units across 2 batches
BuildingTypeArea sq mCount
Kuber Residency2 BHK010
Kuber Residency3 BHK042

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

Shriniwash Buildcon

Partnership FirmPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
1Projects
1City
2020–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
Patna
Anchal (block)
Danapur
Mauja (revenue village)
Sikandarpur
Address
Mauza Rustampur, Shahpur,Mohalla-Sikendrapur, Pargana-Phulwari, P.S And Sub. Registry Office Danapur
What’s nearby
SchoolsNo schools within 2km · Library 1.3km away
HealthcareHospital 965m away · 1 clinic within 1km
Lifestyle1 park within 500m · Gym or sports centre 675m away · 6 restaurants and cafes within 1km
ShoppingSupermarket 459m away · Mall 1.4km away
Getting around
Expressway 603 mPrimary road 2.8 kmRailway line 1.9 kmRailway station 2.5km away (Patliputra)Limited bus connectivity nearby
Water & environment
Canal 1.6 km · Barun CanalWater body 2.0 km · chhat puja talabRiver 2.5 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹10.70 Cr declared to build 52 flats. What that works out to:

₹20.58 Lakhdeclared cost per flatall-in — land + construction
₹1,766/sq ftof built-up area₹19,005/sq m
35%of the cost is land₹1,526/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹14,463per sq yd
₹17,297per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Sikandarpur Nahar Se Purab”.
Highest rate
₹16,529 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹17,297 / sq m₹14,462 / sq yd
Res. Main Road₹19,768 / sq m₹16,529 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (10 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

361 residential projects still under way within 25 km. Step out ring by ring:

Of the 798 projects the radar draws within 6 km — every kind, every stage — 231 are residential projects still under way. This list keeps only those, and looks further out.

31 projects within 1 km — showing the nearest 6.

100 m awayResidential/Group Housing

VINAY BIHAR APARTMENT

RAKESH PRASAD CHANDRABANSI · Danapur · PATNA

Feb 2025registered
Jun 2029target completion
Declared cost₹4.63 CrScale20 flatsAuthorityRERA Bihar
240 m awayResidential/Group Housing

Shri Balajee Bhanu Regency

SHRI BALAJEE NEST BUILDER PRIVATE LIMITED · Danapur

Mar 2023registered
Feb 2028target completion
Declared cost₹97.62 CrScale18 flatsAuthorityRERA Bihar
270 m awayResidential/Group Housing

RAJ VIHAAR

Deep Sheetal Engineers Pvt Ltd. · WARD NO - 39 · PATNA

Oct 2025registered
Mar 2030target completion
Declared cost₹17.68 CrScale38 flatsAuthorityRERA Bihar
280 m awayResidential/Group Housing

BMG SAPPHIRE

BHARTI MERTIYA DEEPAK CONSTRUCTION · Jalalpur · Patna

Jun 2026registered
Aug 2035target completion
Declared cost₹27.91 CrAuthorityRERA Bihar
510 m awayResidential/Group Housing

JAGANNATH ENCLAVE

BUILDMAX DEVELOPERS PRIVATE LIMITED · Danapur

Apr 2022registered
Mar 2026target completion
Declared cost₹1.87 CrScale10 flatsAuthorityRERA Bihar
550 m awayResidential/Group Housing

SHAKUNTLAM TOWER

PATWARI PROJECTS · MUSTAFAPUR · PATNA

Mar 2026registered
Aug 2029target completion
Declared cost₹12.88 CrScale38 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.