The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
LifestylePark 807m away · Gym or sports centre 1.2km away
ShoppingSupermarket 920m away · Mall 1.6km away
Getting around
Expressway 1.2 kmPrimary road 2.7 kmRailway line 2.0 kmRailway station 2.8km away (Danapur)Limited bus connectivity nearby
Water & environment
Water body 1.5 km · chhat puja talabCanal 1.9 km · Barun CanalRiver 2.9 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹7.00 Cr declared. What that works out to:
21%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~20 m of the recorded location in 2020 — before this project started in 2024. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Mar 2017Mar 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2020.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate could not be cross-checked against nearby filings.
The yearly site view ends in 2023, before this project started in 2024.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Bihar registration department
In Bihar it’s called the MVR (minimum value register) rate.
No government guidance rate is shown for this project.
Bihar's Minimum Value Register is in Horizon's record, but this project's mauja couldn't be tied to one thana — or its thana prices land by the katha, a unit whose size differs from district to district, so converting it would be a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RERA Bihar · Approved building plan
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
07
Complaints & litigation
RERA Bihar · public record
Complaints register
Not published. RERA Bihar doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Bihar
Litigation
None declared in this filing
Only what the builder declared, or what RERA Bihar records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Bihar, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
17 commercial projects still under way within 25 km. Step out ring by ring:
Of the 792 projects the radar draws within 6 km — every kind, every stage — 8 are commercial projects still under way. This list keeps only those, and looks further out.
5 projects between 1 and 3 km — showing the nearest 5.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Bihar's published schedules.
06Planning authority
RERA Bihar: the approved building plan, as filed.
07Complaints & litigation
RERA Bihar's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/laacasa-petals-patna-6huxwdov.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.